Laserfiche WebLink
* <br /> SSOCIATES <br /> MEMORANDUM <br /> TO: Steve Fischer <br /> Arrow Companies <br /> Maple Grove, MN <br /> CC: <br /> FROM: Todd Mc Louth, PE <br /> DATE: 11-04-13 <br /> SUBJECT: Starbucks— Elk River, MN <br /> REMARKS: Enclosed are revised plans. The revisions respond to the City Planner's comment <br /> letter dated 10-24-13 and are as follows: <br /> Landscaping: All dead trees to be replaced is noted; the concrete slab for the drop <br /> box is noted to be removed and replaced with appropriate landscaping; a drawing <br /> of the trash enclosure is attached; turning movements and stacking for the drive <br /> lane is attached; ivy plantings on the fence is noted. <br /> Signage: One menu board is shown; one directional sign is shown; one clearance <br /> bar is shown. <br /> Utilities: The relocated transformer is shown relocated with direction from the ER <br /> Municipal Utilities. This will be verified prior to construction. <br /> Todd McLouth, PE <br /> File: 098168.0E <br /> Civil Engineering Planning Land Surveying Landscape Architecture Environmental <br /> 7200 Hemlock In., Maple Grove, MN 55369; Ph. 763-424-5505; Fax. 763-424-5822 <br />