My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2 PCSR 11-12-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2013
>
11-12-2013
>
4.2 PCSR 11-12-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2013 4:09:48 PM
Creation date
11/7/2013 4:09:46 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
11/12/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,d * F F p ctr3._Pi (2 10) <br /> l pt <br /> ...-----*m <br /> r"' "*. 9.4.3 Procedure—The cover shall be fitted in accordance <br /> with the cover manufacturer's instructions. The test objeci <br /> shall be placed at or into any existing opening and apply a frrrc <br /> of 40 lbs (plus or minus 1 pound) steadily to ensure the €'.: <br /> object cannot pass through at the following critical openings: <br /> 34 � 9.4.3.1 Any opening between the edge of the cover and the <br /> a ` deck surface and cooing wall,or both,or the top surface of the <br /> i <br /> = spa or pool. <br /> € a 9.4.3 2 Any opening in the major component of the Lover. <br /> 1 <br /> ° 10. Operating Contr-ols<Safety Covers <br /> 10.1 The open-close switch shall be sprint,-loaded or ofehr <br /> ..$ 7Q'------4 momentary contact type,so that when released,the cover stop, <br /> operation immediately at any point in the open or closed cycle <br /> Nom t--Area=16.6 in.` period. <br /> lure 2—Perimeter=15.0 in. 10.2 The cover shall be reversible in direction from a lint <br /> FIG.2 Template for Swimming Pool Cover Standard <br /> stop at any point in its travel without having to complete the <br /> 9.3.2 :Procedure—Test the cover by spraying writer evenly full open or closed cycle. <br /> over the area at an cpp iau.icrrr rate of 10 gal/min per 7 000 ft" 10.3 T:ectrically operated control switches tit] motors shah <br /> (9.29 m`)of pool area fora period of 30 mitt.During this test, be installed in accordance u tm the National Electrical Cock <br /> all equipment shall operate in accordance with cover manufac- <br /> Article 680 26. <br /> tuner's instructions, Thirty minutes after completion of this 10•' The type of spool covering operating controls shall be <br /> procedure, the cover shall pass the test method in :. At all such that: <br /> tines during the procedure, maintain the pool level at the )0.4.1 Its fixed location is in the line of si«ht of the <br /> waterline. complete pool cover,or by its operating process. This ensures <br /> 9.4 Openings lest: that the operator shall be in complete view of the cover at ai: <br /> 9.4.1 These tests shall be conducted to demonstrate that any tunes during the closing or pool covering process. <br /> openings remain small enough to prevent a small child's head 10.4.2 Switching devices shall be key-operated or locked <br /> from gaining access to the water. away or able to he de-activated or otherwise located in an <br /> 9.4.2 Openings test oi1ject—A solid faced sphere test object inaccessible location. An inaccessible Location shall be at a <br /> With a maximum breadth of 4.5 in. height of at least five feet above the deck. <br /> ANNEX <br /> (Mandatory Information) <br /> Al. RATIONALE <br /> A1.1 Scope A1.2 Referenced Documents <br /> A1.1.1 Although the majority of child-drowning and near- A1.2.1 Allows document reviewers the necessary informa- <br /> drowning which were reported did not involve safety covers_ tion to validate the text of the standard. <br /> those who purport to provide a level of safety should be held <br /> to a higher Level of reliability. Injure' reports aide available A1•ti '^ermistolo, <br /> from CPSC indicate that male children. one and two years of A1.3.1 Consumers and new manufacturers may not be <br /> age,living in a home with an its-ground pool are at the highest familiar with the technological language used within the text. <br /> risk of being involved in a submersion incident that requires This section also provides definitions for new terms created for <br /> medical.care. this standard. <br /> Copyright by ASTM tnt'l(all rights reserved);Mon ALny 23 18:34:21 EDT 2011 <br /> Downloadediprinled by <br /> Michael Caron(Automatic'-Pool-Covers.-Inc.)pursuant to License Agreement.No further reproductions authorized. <br />
The URL can be used to link to this page
Your browser does not support the video tag.