Laserfiche WebLink
B-80 <br /> <br />Introduction <br /> <br />This Comprehensive Facilities Plan is the product of input by parents, administrators, principals, <br />teachers, staff, community members, the school board, and consultants over several years. This <br />summary represents the consolidation of many separate plans and strategies into one inte~jrated <br />document addressing facility needs within the Elk River Area School District. The Comprehensive <br />Facilities Plan is a guide for facilities improvements and the addition of new buildings. It does not <br />directly address changes in the educational programs, curriculum, or organizational policies. <br /> <br />Purpose <br /> <br />The main purpose of the plan is to recommend short and long-term physical improvements to existing <br />facilities and to anticipate where and when new facilities will be needed, The planning is driven by the <br />following nbeds: <br /> <br />· To coordinate all existing district facility plans <br /> <br />· To formalize the annual planning process <br /> <br />· To generate a long term financial plan for facilities. <br /> <br />This Comprehensive Facilities Plan is based on current facility conditions, educational philosophy, <br />district policies, and financial realities. It aims to provide schools in which learning, in safe and healthy <br />environments, for students, families and the community is the priority. The planning horizon is ten <br />years and the fiscal plan is for five years. The plan will be revised annually to reflect the latest <br />economic, political, and demographic conditions. <br /> <br />The Comprehensive Facilities Plan outlined in this summary provides ways to address the key facility <br />needs of the district, including: <br /> <br />New construction to provide learninq space for growing enrollments without over-building. <br />Between 1998 and 2005, we expect to add one new high school and two new elementary schools. <br />In addition the district must change grade configurations, at least temporarily; <br /> <br />2. Implement de._ferred maintenance projects to improve the quality of our existing facilities; <br /> <br />3. Increase routine maintenance funding to limit backlogs in the future and to reduce overall <br /> maintenance costs in the long-term; <br /> <br />4. Upgrade all technoloqy systems focusing on infrastructure improvements and seek additional and <br /> expanded funding to implement upgrades; <br /> <br />5. Address educational program Improvements through capital funding to enhance specific programs <br /> according to annual district priorities; <br /> <br />6. Implement asset manaqement plans which consider the total costs (or savings) by replacing <br /> properties which are not efficient. <br /> <br />A Plan for District 728 Buildings and Sites, September, 1998: Page 2 <br /> <br /> <br />