My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 11-04-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
11-04-2013
>
8.1. SR 11-04-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2013 2:54:41 PM
Creation date
11/1/2013 10:09:46 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/4/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Procedures will be in place within 12 months following the date permit coverage is extended. <br /> D.2.d., City will develop written procedures for conducting site ESC inspections as described in the Permit(Part III.D.4.d). <br /> Procedures will be in place within 12 months following the date permit coverage is extended. <br /> D.2.g., City will develop written procedures for retaining documents of site ESC inspections as described in the Permit <br /> (Part III.D.4.d). Procedures will be in place within 12 months following the date permit coverage is extended. <br /> 3. List the categories of BMPs that address your construction site stormwater runoff control program. Use the first <br /> table for categories of BMPs that you have established and the second table for categories of BMPs that you plan <br /> to implement over the course of the permit term. <br /> Include the measurable goals with appropriate timeframes that each BMP category will be implemented and <br /> completed. In addition, provide interim milestones and the frequency of action in which the permittee will implement <br /> and/or maintain the BMPs. Refer to the EPA's Measurable Goals Guidance for Phase II Small MS4s <br /> (http://www.epa.gov/npdes/pubs/measurablegoals.pdfl. If you have more than five categories, hit the tab key <br /> after the last line to generate a new row. <br /> Established BMP categories Measurable goals and timeframes <br /> Construction Site Stormwater Runoff Ordinance to prohibit <br /> construction site stormwater runoff was approved in June 2007. <br /> An erosion and sediment control section of the Design <br /> Standards division of the City Platting ordinance was updated in <br /> Construction Site Stormwater Runoff Ordinance February 2013. <br /> City Engineering Staff utilizes MPCA the construction and <br /> sediment control checklist from Appendix D of the Current <br /> SWPPP for review of NPDES Erosion Control Permits submitted <br /> Construction Site Plan Review to the department for review. <br /> An erosion control handout, which explains how to properly <br /> install a silt fence and other erosion control BMPs is given to the <br /> Erosion Protection Maintenance Memo to Builders application when a building permit is picked up. <br /> BMP categories to be implemented Measurable goals and timeframes <br /> Update the City Grading, Building, and ROW permits and <br /> Construction Site Stormwater Runoff ordinance to meet the new <br /> permit requirements within 12 months following the date permit <br /> Permit Update coverage is extended <br /> Ensure at least 10%of inspections conducted annually are <br /> performed at deemed high priority inspection sites(e.g., near <br /> Prioritize Inspections sensitive receiving waters,projects larger than 5 acres) <br /> Develop written procedures to track and archive all plan review <br /> and inspection documents within 12 months following the date <br /> Permit Application System ermit covera a is extended. <br /> 4. Provide the name or the position title of the individual(s)who is responsible for implementing and/or coordinating this <br /> MCM: <br /> City Engineer <br /> E. MCM 5: Post-construction stormwater management <br /> 1. The Permit(Part III.D.5.)requires that,within 12 months of the date permit coverage is extended,existing permittees <br /> shall revise their current program, as necessary, and continue to implement and enforce a post-construction stormwater <br /> management program. Describe your current program: <br /> The City has a post-construction sotrmwater management ordinace to encourage the utilization of BMPs for stormwater <br /> runoff from new and redevelopment projects, as well as to ensure the maintenance and operation of the stormwater <br /> BMPs. <br /> 2. Have you established written procedures for site plan reviews that you will conduct prior to the start of ®Yes ❑ No <br /> construction activity? <br /> 3. Answer yes or no to indicate whether you have the following listed procedures for documentation of <br /> post-construction stormwater management according to the specifications of Permit(Part III.D.5.c.): <br /> a. Any supporting documentation that you use to determine compliance with the Permit(Part ❑ Yes ® No <br /> III.D.5.a), including the project name, location, owner and operator of the construction activity, any <br /> checklists used for conducting site plan reviews, and any calculations used to determine <br /> compliance? <br /> b. All supporting documentation associated with mitigation projects that you authorize? ❑ Yes ® No <br /> www.pca.state.mn.us 651-296-6300 800-657-3864 TTY 651-282-5332 or 800-657-3864 • Available in alternative formats <br /> wq-strm4-49a • 5131113 Page 13 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.