Laserfiche WebLink
B. Arena Advertising <br /> North Memorial is still looking at doing"wrap" advertising on the Zamboni. A wrap <br /> is when they cover an area with a vinyl material with graphics' on it, much like what <br /> you may see on a city bus. They have had two companies out looking at the Zamboni <br /> to quote them a price. Barring any unforeseen problems, North Memorial should be <br /> moving forward with their advertising in the near future. <br /> C. Summer Projects <br /> Some of the notable projects that are completed are: <br /> • Two more sections of center grove were installed in the Barn. <br /> • Three areas of the Barn's floor were repaired, where leaks were detected. <br /> • The snowmelt pit was rebuilt in the Barn. <br /> • Shelves were installed in the maintenance room. A desk, phone, and <br /> computer was added so that the Maintenance Supervisor has an area to work <br /> from. <br /> • The roof over the Barn's ice plant was rebuilt. <br /> • Rubber matting was installed in locker rooms 3, 4, and 5. <br /> • The top end of compressor# 2 for the Olympic rink was rebuilt and the <br /> electric motor for the #1 compressor was rebuilt. <br /> There are several other projects that have been completed along with several annual <br /> maintenance items as well as annual janitorial items. <br /> D. Dryfloor <br /> The format for the spring Craft Fair will change from crafts only to a Craft and <br /> Antique Show. Attendance for the show was slipping and a change was needed to <br /> maintain the show. The fall show will remain as a Craft Show. <br />