My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5. - 10. ICESR 04012003
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2000-2009
>
2003
>
04-01-2003
>
5. - 10. ICESR 04012003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2013 10:21:41 AM
Creation date
10/25/2013 8:39:55 AM
Metadata
Fields
Template:
City Government
type
ICESR
date
4/1/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Where will be replacing mats in locker rooms 3 and 4 in the Barn and 5 and 6 in the <br /> Olympic rink. <br /> We are in the process of creating a central workroom where projects can be <br /> performed and where the tools can be stored. Another area of the rink that we will be <br /> changing is where the video machines are. The video machines will be moved to the <br /> Olympic rink and this area will be used for a small pro shop. This area will also be <br /> the center point to check out locker rooms. The Arena will receive its annual spring <br /> and summer cleaning to get it ready for another season. <br /> C) Dryfloor <br /> The Elk River Chamber will be going back to the High School for their expo. The <br /> High School will provide them with the room they need to add more food venders <br /> and demonstrations. <br /> We are continuing to have our two Craft Fairs May 3`1 and 4th and September 13th and <br /> 14th. The Jose Cole Circus will have two dates this season, May 21St and 22"1. Our 4th <br /> through 6th grade dances will be held in April, June, and, September. <br /> D) Rink Floor in the Barn <br /> Over the seasons we recorded how much freon we have put into the system. The <br /> following is the yearly totals since 1998: <br /> Fall of 1998 = 1,000 Fall of 2001 =400 <br /> Fall of 1999 = 1,000 Fall of 2002 = 720 <br /> Fall of 2000 = 625 Winter of 2003 = 420 <br /> Fall of 2000= 625 <br /> As you can see, at the beginning of each skating season we put enough Freon into the <br /> system to bring the charge back within the area that we like to see it operate in. This <br /> winter we needed to add Freon to the system to keep it operating in the area we like to <br /> see it. <br /> There are several possibilities why this might be, however with the history of floor the <br /> two main possibilities are larger leaks in the floor or more leaks in the floor. We will <br /> again be leak checking the floor to see where the floor is leaking and what repairs need to <br /> be made. <br />
The URL can be used to link to this page
Your browser does not support the video tag.