Laserfiche WebLink
Vanman/LeFebvre CU 04-22 <br /> August 24,2004 Page 2 <br /> Overview <br /> The applicant is proposing to construct a 70'X 100' storage building. Since the property is <br /> zoned PUD, a conditional use permit to amend the PUD is required to construct the <br /> proposed building. The proposed building is located along the north property line;it will be <br /> setback 13 feet from the north property line and about 105 feet from the east property line. <br /> The Furniture and Things warehouse is located to the north and the BNSF railroad tracks <br /> are to the east. There is about 33 feet between the Furniture and Things warehouse and the <br /> proposed building. <br /> The building will be 18 feet tall and constructed of concrete blocks. There are two overhead <br /> doors on the east side. <br /> No other improvements to the property are proposed as part of this project. <br /> Analysis <br /> Setbacks <br /> The proposed side yard setback for the building is 13 feet. The required side yard setback in <br /> the light industrial district is 25 feet. The Furniture and Things warehouse is setback 20 feet <br /> from their south property line. In 1994 they were granted a variance to the required 25 foot <br /> side yard setback setback. Since this property is a Planned Unit Development, a 13 foot side <br /> yard setback can be approved without the need for a variance. The Fire Chief has reviewed <br /> the site plan and is ok with the distance between the two buildings. <br /> Building Elevations <br /> The exterior of the building will be concrete block. The exterior should match the existing <br /> building. Accent stripes are also proposed around the top of the building. The two overhead <br /> doors on the east side of the building will be accessed from the existing yard area. <br /> Grading and Drainage <br /> There are no significant grading or drainage issues. <br /> Sewer and Water <br /> The site is currently served by on-site well and septic. The PUD Agreement for the Leon <br /> Lefebvre Addition states that no further development will be allowed in the Subdivision <br /> until city water and sanitary sewer are available. Furthermore,it states that the Developer will <br /> hook-up to city water and sanitary sewer within 2 years after these services become available, <br /> and will pay all availability and connection charges then in effect at the time of hook-up. The <br /> services were installed in 1998. The applicant will have to hook-up to city water and sanitary <br /> sewer. <br /> S:A PLANNING\Case Files\2004VCU 04-22 VanmanVCU04-22PC8-24.doc <br />