My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. PCSR 08-24-2004
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2004
>
08-24-2004
>
5.3. PCSR 08-24-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2013 12:16:06 PM
Creation date
10/18/2013 12:11:23 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
8/24/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Each year a plan for that year's reclamation shall be approved by the <br /> Building and Environmental Administrator prior to issuance of the <br /> mineral excavation license. <br /> c. Upland reclamation shall include topsoil from the site being <br /> preserved and put back into place after mining and seeded as per the <br /> approved plans. The vegetation established for the reclamation must <br /> be maintained until it is self-sufficient. <br /> d. Wetland restoration shall be in compliance with the approved <br /> wetland mitigation plan. The Operator shall provide a letter of credit <br /> in favor of the City for wetland restoration in the amount of$ . A <br /> formal wetland monitoring plan shall be submitted for City approval <br /> one year after wetland restoration has been completed on the <br /> Property and the Schuer, Inc. site. The wetland letter of credit may <br /> be released upon approval of the first year monitoring report, but <br /> monitoring shall continue for an additional 2 to 4 years after, as <br /> determined by city staff. <br /> e. Contours, finished grades, details of erosion control methods, and <br /> settling ponds, shall comply with the plans submitted and the City <br /> ordinance at the time of reclamation. Additional measure as <br /> determined by city staff may be required. <br /> (10) Traffic <br /> a. Gravel mined as part of the Operation shall be hauled directly to the <br /> Elk River Bituminous site via easements, not accessing any public <br /> road. Peat mined as part of this Operation will be hauled to Bauerly <br /> Bros.' existing access onto 225t Ave. via easements and then west to <br /> US Trunk Highway 169. No traffic will be allowed to go east on <br /> 225th Avenue. <br /> b. The sale of product from the Operation shall only take place from <br /> the Elk River Bituminous site and then only after receiving <br /> authorization from the Minnesota Department of Transportation and <br /> completing all required improvements to the access for that site prior <br /> to commencing said sales. <br /> (11) Dust Control <br /> a. A permit from MPCA regarding air emissions shall be obtained when <br /> required and particulate emission standards shall be met by the <br /> Operation. This permit and all other correspondence between the <br /> Operator and MPCA shall be copied to the City. <br /> b. All equipment shall be located as to reduce dust to adjacent <br /> properties. <br />
The URL can be used to link to this page
Your browser does not support the video tag.