Laserfiche WebLink
Schuer, Inc./Schmidt Gravel Mine <br /> Page 2 <br /> activities. The Plan should state that there will be no maintenance of the equipment on the site. The <br /> Plan should identify to.contents and capacity of the spill kit that is provided with the refueling vehicle. <br /> A specific refueling location(s) should be identified in the Plan in an area(s)where spill response can <br /> be effectively implemented. The refueling location(s) would ideally be an area(s) with a relatively <br /> impermeable surface, closed contours and minimal slope. <br /> Q:W-C\CER\2004-511\Correspondence\ShuerReview.doc <br /> 2 <br />