Laserfiche WebLink
Page 3 <br /> Mr. Steve Rohlf <br /> March 29, 2004 <br /> The mined material will be hauled to Elk River Bituminous located approximately 1/4-mile south of <br /> the Property using a private access road, as approved as part of the original CUP. Mining <br /> operations be conducted between the hours of 7:00 AM and 7:00 PM as required by the City of Elk <br /> River. All mitigative measures currently in place at the Property as part of the previous CUP for <br /> Phases 1-3, (i.e dust control, noise control, and spill prevention and response), will be followed as part <br /> of Phase 4 mining. <br /> If you have any questions or comments regarding the enclosed, please call me at (763) 489-3178 or Glen <br /> Johnson, Site Manager at (320) 252-8817. Thank you for your time and assistance with this project. <br /> Sincerely, <br /> LIESCH ASSOCIATES, INC. <br /> Jon Blaha <br /> Environmental Geologist <br /> Enclosures <br /> Cc: Roger Schmidt <br /> Glen Johnson <br /> John Lichter—Liesch <br /> w:\env\64480\CUP submittal Itr.032904.doc <br /> THE LIESCH COMPANIES MINNEAPOLIS, MN MADISON, WI SCOTTSDALE, AZ <br />