My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. PCSR 08-24-2004
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2004
>
08-24-2004
>
5.2. PCSR 08-24-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2013 12:00:00 PM
Creation date
10/18/2013 11:48:18 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
8/24/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br /> Mr. Steve Rohlf <br /> March 29, 2004 <br /> The mined material will be hauled to Elk River Bituminous located approximately 1/4-mile south of <br /> the Property using a private access road, as approved as part of the original CUP. Mining <br /> operations be conducted between the hours of 7:00 AM and 7:00 PM as required by the City of Elk <br /> River. All mitigative measures currently in place at the Property as part of the previous CUP for <br /> Phases 1-3, (i.e dust control, noise control, and spill prevention and response), will be followed as part <br /> of Phase 4 mining. <br /> If you have any questions or comments regarding the enclosed, please call me at (763) 489-3178 or Glen <br /> Johnson, Site Manager at (320) 252-8817. Thank you for your time and assistance with this project. <br /> Sincerely, <br /> LIESCH ASSOCIATES, INC. <br /> Jon Blaha <br /> Environmental Geologist <br /> Enclosures <br /> Cc: Roger Schmidt <br /> Glen Johnson <br /> John Lichter—Liesch <br /> w:\env\64480\CUP submittal Itr.032904.doc <br /> THE LIESCH COMPANIES MINNEAPOLIS, MN MADISON, WI SCOTTSDALE, AZ <br />
The URL can be used to link to this page
Your browser does not support the video tag.