My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 10-21-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
10-21-2013
>
8.1. SR 10-21-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2013 1:38:24 PM
Creation date
10/17/2013 1:27:25 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/21/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Elk River, Minnesota <br /> Preliminary Financial Analysis of Blackhawk Woods TIF Application <br /> 10/03/2013 <br /> Page 10 <br /> in this memo, based on current assumptions it would take approximately 23 years of the district to meet the request. <br /> The need for TIF assistance can be evaluated on an annual basis, due to the reduced operating revenues resulting <br /> from the affordable units and will remain the case as long as a portion of the units are income restricted. As a result, <br /> the length of time the City desires to maintain the affordable housing units may become a factor in determining the <br /> level and amount of TIF assistance. <br /> In some cases, there may be opportunities to fill a portion of the gap by other means—thereby reducing the required <br /> TIF subsidy and/or term. The developer could consider deferring a portion of the upfront developer fee, rental rates <br /> might also be able to be increased if the project proves successful, however the rates are ultimately dictated by both <br /> market and income requirements of TIF Districts, actual project costs may be less than projected, and finally, a <br /> reduction in the TIF note interest rate (from 4.70%) may also be considered. <br /> As illustrated in our analysis outlined above, it appears the project is infeasible without assistance absent significant <br /> changes to either the equity investment, project cost assumptions, or projected operating income. Given our review <br /> of the current assumptions it appears as if changes of this magnitude are unlikely to be realized. Therefore, we feel <br /> the proposed project is unlikely to proceed but-for the requested TIF assistance. <br /> Additionally, if the City were to undertake the provision of TIF assistance for the project, the duration of the District <br /> would need to be determined. The Developer has indicated a request for a TIF District term of 25-years, to allow <br /> them to maximize the additional mortgage they could secure based on the TIF revenue. If a TIF duration of a shorter <br /> period were to be utilized it would require the Developer satisfy a$266,137 through additional equity. <br /> It is important to note that the project will be providing affordable senior housing in the City of Elk River. Without the <br /> tax increment assistance, the developer has indicated he is not able to proceed with the project due to rent <br /> restrictions required. Thank you for the opportunity to be of assistance to the City of Elk River. Please contact me at <br /> (651)223-3036 or mhuot(@springsted.com with any questions or comments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.