Laserfiche WebLink
ELK RIVER MUNICIPAL UTILITIES <br /> Demand Electric Service <br /> Summer: The summer rate shall apply to the Customer's use from May 1 through <br /> September 30. <br /> Winter: The winter rate shall apply to the Customer's use from October 1 through April <br /> 30. <br /> Determination Of Billing Demand: The billing demand shall be the highest measured <br /> demand ( corrected for power factor if required) during any fifteen (15) minute period <br /> occurring in the current billing period. <br /> Fluctuating Loads: Customers operating equipment having a highly fluctuating or large <br /> instantaneous demand, such as welders and X-ray machines, shall be required to pay all <br /> non-betterment costs of isolating the load from the balance of Elk River Municipal Utilities' <br /> system so that the load will not unduly interfere with service on Elk River Municipal <br /> Utilities' lines. In addition, Customers who fail to provide adequate corrective equipment <br /> shall be required to own and maintain their own transformers. No motor larger than ten <br /> (10) HP will be allowed to be across-the-line started without notification and written <br /> authorization from Elk River Municipal Utilities. <br /> Power Factor Adjustment: For loads of 50 KW or more, or at the option of Elk River <br /> Municipal Utilities for loads of less than 50 KW, power factor adjustments will be made in <br /> the billing demand, when the power factor, as determined by test, at the time of the <br /> Customer's maximum use is less than 95%. If the power factor, as measured by Elk River <br /> Municipal Utilities' electric department, is lower than 95%, the monthly demand charge <br /> may be multiplied by the ratio 95% to the measured power factor, or at Elk River <br /> Municipal Utilities'option, the power factor may be corrected at the Customer's expense. <br /> Terms of Payment: Bills are due and payable upon receipt and delinquent if not paid by <br /> the due date noted the bill. There will be a ten (10) percent late payment charge added to <br /> all accounts that are not paid by the due date. <br /> Terms and Conditions: <br /> 1. Usage may be fractionalized on the actual days of service for application of a <br /> change in rate. <br /> 2. Service will be furnished under Elk River Municipal Utilities rules. <br /> 3. Extensions made for service under this schedule are subject to the provisions of Elk <br /> River Municipal Utilities' rules governing Extension of Service and Facilities. <br /> 4. The rates set forth herein may be modified by the amount of any governmental <br /> changes imposed and levied on transmission, distribution, production, or the sale of <br /> electrical power. <br /> Approved y . ,1 Adopted November 12,2002 <br /> PP `� <br /> U Effective January 1,2003 <br />