My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ERMUSR MISC ISSUES 07-08-2003
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2003
>
07-08-2003
>
ERMUSR MISC ISSUES 07-08-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2013 11:40:41 AM
Creation date
10/15/2013 11:40:41 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/8/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I agree to allow ERMU to install an electric meter on the electric water heater circuit <br /> to measure the electric energy used by the electric water heater. This measured energy <br /> will be used to calculate the electric thermal storage water heating credit. ERMU will <br /> pay for all costs associated with the meter installation and associated wiring. <br /> Signature Date <br /> Address <br />
The URL can be used to link to this page
Your browser does not support the video tag.