Laserfiche WebLink
GIA.RDLAN ANGELS PROJECT DESCRIPTIONS <br /> Area 1 <br /> The project consists of the expansion of a current parking lot on the northwest portion of <br /> the Guardian Angels Care Center property. This parking lot expansion would provide <br /> parking for 55 additional vehicles. This expansion would bring the total number of <br /> parking spaces to 159 in the north parking area. The new lot is planned to be asphalt with <br /> cement curb and gutter. Additional lighting would be installed in this expansion area. <br /> There will be minimal grading required with this project. In working with the City of Elk <br /> River, Guardian Angels allowed the City to remove a significant amount of soil from this <br /> site for work being completed at Lions Park during the summer of 2003. This <br /> collaboration with the City was done with the thought that eventually this site would be <br /> utilized for expanded parking at some point in the future. <br /> The expanded parking area would be primarily utilized by Guardian Angels staff. - <br /> Additionally, this area would be used by students from Anoka Technical College who <br /> conduct clinical nursing and nursing assistant classes at Guardian Angels Care Center. <br /> By expanding our existing parking lot, Guardian Angels will be able to provide ample <br /> space for visitor parking in our main parking lot closest to the building. <br /> Area 2 <br /> This project consists of expanding the current parking facilities to create 9 additional <br /> parking spaces in the independent housing portion of our campus. This expansion would <br /> be complete with an asphalt surface, cement curb and gutter and a sidewalk extension. <br /> There would not be any additional lighting required for this expansion. The area would <br /> be utilized for Guardian Angels staff who work in the housing and corporate offices <br /> located in these buildings. <br />