My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. SR 01-26-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
01/26/2004
>
5.4. SR 01-26-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:20 AM
Creation date
2/2/2004 3:19:16 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/26/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Howard R. Green Gompany <br /> <br />Item 5.4. <br /> <br />Januaw 23,2004 <br />File: 822870J-0325 <br /> <br />Mr. Pat Klaers <br />City Administrator <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: WASTEWATER TREATMENT PLANT MASTER PLAN <br /> <br />Dear Mr. Klaers: <br />This correspondence is intended to present the scope of services and estimated level of effort for the <br />proposed Wastewater Treatment Plant (WWTP) master plan. This scope of services was developed <br />after several meetings and discussions with Michele McPherson, Director of Planning, relative to the <br />comprehensive plan update, and Gary Leirmoe, Chief Operator of the WWTP. The scope of services <br />has been divided into five main parts with several of these having sub-parts identified underneath <br />them. The scope of services is as follows: <br /> <br />Determine Sanitary Sewer Capacity <br /> <br />Determine the available treatment capacity at the current WWTP, assuming a <br />small amount of land acquisition from Great River Energy is possible. <br /> <br />· Review and analyze the ultimate WWTP sewer capacity based on design <br /> calculations and conceptual drawings from the 1995 WWTP expansion. <br />· Analyze current treatment technology and project future additional treatment <br /> processes that will be needed. <br />· Discussions with Great River Energy to determine amount of land possible for <br /> additional acquisition to WWTP site. <br />· Prepare analysis of ultimate WWTP capacity and develop schematic of current <br /> WWTP facility with future treatment processes. <br /> <br />B. Determine ultimate wastewater flow from the current Urban Service Area. <br /> <br />· Identify current areas developed in various land uses relative to the current <br /> average WWTP daily sewage flow. <br />· Identify areas that are currently platted but not built on and project estimated <br /> future sewage flow based on land use. <br /> <br />Ltr-011204-Klaers.doc <br />2550 University Avenue West · Suite 400N ° St. Paul, MN 55114 ° 651/644-4389 fax 651/644-9446 toll free 888/368-4389 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.