My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 10-08-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2013
>
10-08-2013
>
6.1. ERMUSR 10-08-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2013 1:53:29 PM
Creation date
10/9/2013 12:15:22 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/8/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Mark Fuchs— Electric Superintendent <br /> John Dietz—Chair <br /> Al Nadeau— Vice Chair <br /> Daryl Thompson— Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> October 8, 2013 6.l c <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Had six new services. <br /> • Working on changing out a few of our older rusty live front switchgear. The new <br /> switchgear is dead front and safer to work on. <br /> • Continue rebuilding Troy and Union Street. This is an overhead 2400 volt line that we are <br /> changing to underground and upgrading the voltage to 7200. <br /> • Buried some overhead secondaries on 3`d street and replaced some street light poles. This <br /> was part of the road project the City was doing. <br /> • Continue working on feeder 94 rebuild. The first part of this job is removing the overhead <br /> three phase rear lot line that is located between School St. and Gates Ave. <br /> • Started working on the second part of the feeder 94 rebuild. We are installing primary <br /> wire to loop the transformers for the businesses east of Gates Ave. <br /> • Working on getting the new substation transformer at the north substation site back on <br /> line. <br /> • Working on changing out the 69kv breaker at the Waco substation and doing <br /> maintenance on the 69kv air switch. <br /> • Working on changing out the street light poles and light fixtures on Gates Ave. We are <br /> installing fiberglass poles and LED fixtures. <br /> 1� .. <br /> 10111EFIED <br /> I Y <br /> R'r3 Page 1 of I NATURE <br /> Poerlovtl wrPi r <br /> P OwE0.E0 TO SE0.VE <br /> 125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.