Laserfiche WebLink
Capital Improvement flan 2014 thru 201 <br /> Department Infiastructure linprovements <br /> City of Elk River, Minnesota Contact Engineer <br /> F Type Infiastiucture <br /> Project# ST-12 Useful Life 20 years <br /> Project Name Signalization of 193rd Avenue&Evans Street Category Street Construction <br /> Priority n/a <br /> Description <br /> Install a signal system including EVP at the intersection of 193rd Avenue and Evans Street.Because of the proximity to TH169,the signal system <br /> must be interconnected with the existing highway signal system. <br /> Justification <br /> The construction of 193rd Avenue(2009)street improvement opens 193rd to CSAH 13 allowing another route to and from TH169. In anticipation <br /> of the increased traffic flow the intersection of 193rd Avenue and Evans Street was constructed to accept a signal system. <br /> Expenditures 2014 2015 2016 2017 2018 Total <br /> Planning/Design 250,000 250,000 <br /> Total 250,000 250,000 <br /> Funding Sources 2014 2015 2016 2017 2018 Total <br /> Municipal State Aid 250,000 250,000 <br /> Total 250,000 250,000 <br /> i <br /> i <br /> i <br /> 2014-2018 CAPITAL IMPROVEMENTPLAN <br /> i <br />