Laserfiche WebLink
available lots in Elk River with 200 to 300 meters being added annually. If this rate <br /> continues, we will be adding a water production facility on a two to three year interval. <br /> The enclosed map shows the location of the proposed facility along with future water <br /> production facilities. Water production facilities 8 & 9 will be peaking facilities where <br /> the facility is utilized only during peak times with minimal water treatment, (fluoride, <br /> chlorine, no iron and manganese removal). A full water production facility with iron and <br /> manganese removal will cost in the area of$1,500,000. <br />