My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.4. ERMUSR 05-13-2003
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2003
>
05-13-2003
>
6.4. ERMUSR 05-13-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2013 11:19:40 AM
Creation date
10/3/2013 11:19:39 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/13/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
available lots in Elk River with 200 to 300 meters being added annually. If this rate <br /> continues, we will be adding a water production facility on a two to three year interval. <br /> The enclosed map shows the location of the proposed facility along with future water <br /> production facilities. Water production facilities 8 & 9 will be peaking facilities where <br /> the facility is utilized only during peak times with minimal water treatment, (fluoride, <br /> chlorine, no iron and manganese removal). A full water production facility with iron and <br /> manganese removal will cost in the area of$1,500,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.