Laserfiche WebLink
112.8(c)(6). The time interval between inspections shall be based on good engineering <br /> practice and generally accepted industry standards such as American Petroleum Institute <br /> (API) 653. API 653 recommends draining, cleaning and internally inspecting tanks every <br /> 10 years unless a previous inspection indicates a longer time period between inspections is <br /> acceptable. Particularly for bulk tanks, visual inspection must be combined with another <br /> technique such as hydrostatic,radiographic, ultrasonic acoustic emissions, or another system <br /> of non-destructive shell thickness testing. <br /> 10. Maintain quick access to a source of oil booms to cross the nearby waterway and enough <br /> pillows, pads, and absorbent sheets to absorb a 100-gallon spill. Also ensure access to oil <br /> barrels, portable oil pumps and sandbags in the event of a petroleum discharge (40 CFR <br /> 112.7(a)(3) and (5)). <br /> I hereby acknowledge that I have reviewed Section 1.2 and understand that several facility <br /> improvements are required to fully implement this SPCC plan. <br /> Bryan Adams, General Manager Date <br /> 5 <br />