My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. ERMUSR 05-13-2003
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2003
>
05-13-2003
>
5.4. ERMUSR 05-13-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2013 10:46:36 AM
Creation date
10/3/2013 10:46:36 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/13/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMERCIAL INTERRUPTIBLE LOAD AGREEMENT <br /> THIS COMMERCI.-1L INTERRUPTIBLE LOAD AGREEMENT, made as of this <br /> day of by and among Elk River Municipal Utilities, "ERMU" and <br /> "Customer", applies to commercial customers <br /> of between 100 kW and 1000 kW peak load who agree to interrupt between 100 kW and <br /> 1000 kW of their load when requested to do so by ERMU. <br /> Subject to the terms and conditions of this Agreement, and in reliance to the representations <br /> and covenants herein contained, ERMU and Customer agree as follows: <br /> ARTICLE 1. DEFINITIONS. As used in this Agreement the following terms have the <br /> meanings given them unless the context requires otherwise: <br /> Agreement means this Agreement, as it may be from time to time modified, amended <br /> or supplemented. <br /> Demand means Customer load measured in kilowatts (kW) averaged over a <br /> continuous 60 minute period. <br /> Interruptible Load means the difference between Customer's demand and a <br /> predetermined demand level (PDL) Customer agrees to attain following notification <br /> by ERMU to reduce demand. <br /> Kilowatt (kW) means unit of electric power equal to 1000 watts. <br /> Kilowatthour (kWh) means unit of electric energy equal to one kilowatt of power <br /> supplied to or taken from an electric circuit steadily for one hour. <br /> Predetermined Demand Level (PDL) means the maximum level of electric power <br /> Customer agrees to attain when notice to interrupt load is given by ERMU or its <br /> designated agent. For the purposes of this Agreement, Customer agrees to interrupt <br /> enough load to attain a PDL of kW when requested. <br /> Spring/fall season means the period from March 1 through May 31, and <br /> September 1 through November 30. <br /> Summer means the period from June 1 through August 31. <br /> Utility means Elk River Municipal Utilities <br /> Winter means the period from December 1 through February 28 or 29. <br /> ARTICLE 2. TERM. This Agreement shall begin at 12:01 a.m. on <br /> and shall continue until 12:00 a.m. on or until termination as provided for <br /> in Article 12. <br />
The URL can be used to link to this page
Your browser does not support the video tag.