voltage. Break-before-make auto reconnect to the utility source shall be <br /> permitted only after the utility source has been established for a minimum of <br /> two minutes. <br /> Manual Disconnect. A means shall be available to positively disconnect <br /> Customer from the system such that there is no possibility that Customer <br /> could backfeed through the service transformer and energize the system. <br /> This requirement shall be met with a switch housed in an approved <br /> enclosure which can be secured with a padlock or locking device located <br /> between Customer and ERMU's system. <br /> Automatic Transfer. Closed transition (soft transfer) is permitted only after <br /> the utility source has been established for a minimum of 5 minutes. Paralleling <br /> between Customer's generator and the utility shall incorporate appropriate <br /> synchronization equipment and shall be limited to10 milliseconds to <br /> accomplish the transition. Transfer switch shall have electrical interlock to <br /> prevent closing on the utility if there is a loss of utility voltage. Auto retransfer <br /> (soft transfer) to the utility source shall be permitted only after the utility source <br /> has been established for a minimum of 2 minutes. <br /> Manual Transfer. Soft transfer is not permitted. For manual transfer, the <br /> transfer switch shall have a mechanical interlock to prevent paralleling to the <br /> utility. <br /> Section 3: Power Quality. Operation of Customer's generation and auxiliary <br /> equipment must not cause any reduction in the quality of service provided by <br /> ERMU to its customers nor interfere with the operation of ERMU's distribution <br /> system or ERMU power supplier's transmission system. The equipment shall not <br /> put any undesirable voltages, frequencies, or transients on to ERMU's distribution <br /> system or ERMU power supplier's transmission system. If any of the <br /> aforementioned events occur, the equipment shall be disconnected until such time <br /> as the harmful conditions have been corrected. Customer shall be responsible <br /> for taking any corrective action that may be required and/or reimbursing ERMU <br /> for the cost of corrective action which ERMU deems necessary to provide and <br /> restore services to prescribed limits. Customer's generator will generate 3 phase, <br /> 60 hertz power delivered to ERMU at normal 12.47 Kv at a power factor of 98% <br /> lagging. Total Harmonic Distortion (THD) levels produced by the equipment <br /> shall be less than 1%. <br /> ARTICLE 5. GENERATING EQUIPMENT OPERATION. Upon not less than <br /> thrity minutes notice by ERMU to Customer prior to generator start-up time, Customer <br /> shall operate the generating equipment at the output level stated in Article I, under <br /> Generating Equipment during the period requested by ERMU. During such period <br /> ERMU shall not be obligated to serve Customer's electric load to the extent of the <br /> generator (s) output. Customer shall comply with all applicable generation regulations of <br /> 3 <br />