Laserfiche WebLink
Elk River Municipal Utilities <br /> 2005 Electric Distribution Capital Projects <br /> Equipment Needs Delay to Next <br /> Year <br /> $75,000 Replace 1 pickup truck, add 2 pickup trucks <br /> $70,000 Replace 485 Vermer cable plow <br /> $70,000 Add used flatbed truck crane <br /> $14,000 Replace 22 year old trailer <br /> $8,000 Add 15,000 ft trailer for hauling material <br /> $12,000 Replace old single place wire trailer <br /> $5,000 Replace tires <br /> $5,000 Ropes, slings & chains <br /> $6,000 Battery operated tools <br /> $3,000 Hydraulic operated tools <br /> $3,000 Fiberglass hotline tools <br /> $8,000 Replace hand tools <br /> $279,000 Total <br /> Normal Distribution Construction <br /> $135,000 Rebuild area 21 south of Co Rd 33 (1) <br /> $150,000 Rebuild in area 15 to acquire area 16 <br /> $60,000 Rebuild 194th Av & convert to 7200 V (3) <br /> $100,000 Relocate lines for overpass on HW 101 construction <br /> in Otsego <br /> $50,000 Continue new feeder 97 from Station 14 to West <br /> Business Park <br /> $150,000 Rebuild lst & 2' at Gates & Evans So of Main St (4) <br /> $95,000 Rebuild in area 23 along Co Rd 70 So of Co Rd 21 (2) <br /> $50,000 Extend feeder 72 up Co Rd 1 <br /> $790,000 <br /> New Developments <br /> Twin Lake Estates <br /> Orrin Thompson <br /> Trott Brook <br /> Woodland Hills <br /> Belmont Estates (TLM) <br /> Eagle Ridge <br /> 4th engine/generator at Elk River Landfill $600,000 which will be funded by <br /> Sherburne Co. <br />