My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. ERMUSR 09-21-2004
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2004
>
09-21-2004
>
5.3. ERMUSR 09-21-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2013 2:47:05 PM
Creation date
10/1/2013 2:47:05 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/21/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River Municipal Utilities <br /> 2005 Water Distribution & Electronic Technologies Capital Projects <br /> Water Department Capital Projects <br /> $100,000 Repair & Repaint Auburn St. Water Tower <br /> $30,000 Warranty Inspection & Cathodic Protection, Johnson St Tower <br /> $25,000 Eliminate Dead End Water Mains (Guardian Angles) <br /> $100,000 Main Replacement on 5th St. <br /> $50,000 Initiate Aquifer Storage & Recover Study <br /> $27,000 Continue GIS System to Locate Valves & Purchase Equipment <br /> /Software <br /> $20,000 Pull & Inspect Well #2 <br /> $15,000 Trailer Mounted Air Compressor w/Accessories <br /> $8,000 Upgrade Well #4 Meter <br /> $5,000 Miscellaneous Equipment & Repairs <br /> $380,000 <br /> Electronic Technologies Department Capital Projects <br /> $7,000 Miscellaneous Equipment & Repairs <br />
The URL can be used to link to this page
Your browser does not support the video tag.