My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3. ERMUSR 07-06-2004
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2004
>
07-06-2004
>
3. ERMUSR 07-06-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2013 11:47:12 AM
Creation date
10/1/2013 11:47:11 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/6/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> Regular meeting of the Elk River Municipal Utilities Commission <br /> June 8, 2004 <br /> 5.2 Review Springstad Cash Flow Study <br /> Bryan Adams reviewed with the commissioners the cash projections for the electric and water departments. <br /> He explained the need for additional funds to build an electrical feeder and the relocating of electrical lines for <br /> the Hwy 101 interchange. The bonding would either be done through the City or MMUA's bond pool. <br /> Motion by James Tralle to authorize staff to proceed with the bonding of the requested $900,000. John Deitz <br /> seconded the motion. Motion carried 3-0. <br /> 5.3 Review Security System Operation <br /> A profit and loss was discussed with the security program continuing to make money. Bryan Adams <br /> reviewed with the commission the status on the security system program. He feels there is more profit to be <br /> made and we could market security better by hiring someone to promote, sell, and install the systems. It is hard <br /> to find the right person, but the possibility is out there. We will continue to look for the right person. <br /> 5.4 Review and Consider Water Meter Change Out Policy <br /> The procedure for changing out water meters was discussed. We are having some difficulties reaching <br /> some of the homeowners to change-out water meters. A procedure was discussed to contact water customers <br /> including phone calls, door hangers, and two written letters with the last letter indicating loss of water service. <br /> It was decided that all effort will be made to contact the homeowner to get this resolved without resorting to <br /> shutting their water off to get them to respond, but by consensus, loss of water service could be used as a very <br /> last resort. <br /> 5.5 Review Land Cost for Future Wells <br /> With the new developments in the area, the need for more wells was addressed. Bryan Adams will <br /> continue to work with the planning department at the City to procure land for wells in the new developments at <br /> minimal cost to the utility. <br /> 6.1 Review and Consider Radio Repeater <br /> Bryan Adams informed the commission about the 2-way radio communication difficulties we are having <br /> with crews in northern Elk River and in Dayton. A temporary repeater was placed on the Auburn Street tower <br /> with great results. Staff requests authorization to purchase and install a 2-way radio repeater system at a cost of <br /> $15,000. <br /> James Tralle moved to purchase and install a 2-way radio repeater system. John Dietz seconded the motion. <br /> Motion carried 3-0. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.