Laserfiche WebLink
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission David Berg—Water Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> August 13, 2013 6.1 <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> The Freeport water tower is finished. The weather was a problem throughout the whole process. Either it <br /> was too humid, raining, windy or just too hot;the painters struggled with having good consistent days in a <br /> row.After washing, sanitizing, and taking two water samples from the tower, it will go back online. <br /> Pete and Angela have finished servicing and exercising about 130 water hydrants along with several other <br /> tasks that have come up. <br /> Bolton and Menk have been working with Eric to find about 800 gate valves that have not had the GPS <br /> coordinates mapped. This will make it easier for the whole department to find valves in case of a water <br /> break and will make the maps much more accurate. <br /> New water main was installed on 185`h Ave., 3rd Street and some side streets. This is now completed. <br /> R� <br /> 101IEREP BI <br /> �'3 Page 1 of 1 NATURE <br /> Reliable Public <br /> Power Provider <br />