My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.5. PRSR 09-11-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2011-2020
>
2013
>
09-11-2013
>
6.5. PRSR 09-11-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2013 11:50:29 AM
Creation date
9/27/2013 8:34:00 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
9/11/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
new grass areas around the playground. The trees will be placed around the perimeter of the <br /> playground/benches needed for future shade. <br /> A double see saw with a higher load capacity will be installed to replace the current seesaw. Orono Park <br /> is in need of new ADA vandal resistant picnic tables for the shelters. A total of 14- ADA compliant <br /> picnic tables will replace the current tables that will be installed in other parks. <br /> New for 2014 <br /> #6 YAC well and irrigation $35,000 <br /> The additional well and irrigation will provide more efficient watering turf and trees. It will allow to <br /> time to water during the early morning hours when there is less wind and sun to compete with and the <br /> additional irrigation will water areas not currently irrigated along with trees. The irrigation of trees will <br /> provide the needed water on a regular basis and will require less staff time <br /> Current- This project has been pushed off each year for the past two years. <br /> #7 Orono Park Health Beat $18,000 <br /> We are requested by residents to continue health and wellness family fun and a sense of community with <br /> a comprehensive balanced workout at Orono Park. We already have a stair stepper in the Health Beat <br /> system that was part of the original playground. This project will include an area concrete pad near the <br /> new playground for an overall Health Beat system and two pieces of equipment in the line- a chest back <br /> press and an Ab crunch leg lift. Additional systems will be added on the concrete pad in additional <br /> years. <br /> New for 2014. <br /> #8 Dog Park irrigation and trees- $6,000 <br /> Installing irrigation and trees will provide users a much more pleasant environment to enjoy their time <br /> with other park user and their pets. The irrigation will assist with maintaining a healthy turf and provide <br /> sufficient water for the newly planted trees,which provide shade and a natural buffer between the dog <br /> park and the City Hall Campus. <br /> This project was in the budget for 2013 at$10,000 but did not get completed. <br /> CAUsers\dove A Desktop\Projea descriptions for 2014.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.