Laserfiche WebLink
• <br />• <br />• <br />Elk River Youth Athletic Complex <br />Proposed Parking Lots <br />Preliminary Estimate <br />Item <br />Unit Bid Qty Unit Price Amount Bid <br />7/19/2013 <br />Mobilization <br />LS <br />1 <br />$5,000.00 <br />$5,000.00 <br />Rock Construction Entrance <br />EA <br />2 <br />$1,222.50 <br />$2,445.00 <br />Silt Fence <br />LF <br />1200 <br />$4.00 <br />$4,800.00 <br />Bio Rolls <br />LF <br />200 <br />$5.40 <br />$1,080.00 <br />Common Excavation <br />CY <br />20701 <br />$6.00 <br />$12,420.00 <br />Salvage /Respread topsoil <br />LS <br />1 <br />$5,000.00 <br />$5,000.00 <br />Pond Grading/ Bio Retention <br />LS <br />1 <br />$20,000.00 <br />$20,000.00 <br />8612 Concrete Curb and Gutter <br />LF <br />1750 <br />$14.30 <br />$25,025.00 <br />Concrete Pedestrian Ramp <br />EA <br />3 <br />$770.00 <br />$2,310.00 <br />Rip Rap with Membrane <br />EA <br />8 <br />$575.00 <br />$4,600.00 <br />Cl 5 Agg. Base <br />TON <br />2700 <br />$17.00 <br />$45,900.00 <br />Bituminous Base Course <br />TON <br />940 <br />$75.00 <br />$70,500.00 <br />Bituminous Wear Course <br />TON <br />700 <br />$80.001 <br />$56,000.00 <br />Turf Establishment <br />ISY <br />13000 <br />$0.901 <br />$11,700.00 <br />Sub Total = $266,780.00 <br />Contingency (10 %) $26,678.00 <br />Total Construction $293,458.00 <br />Eng./ Admin. Costs (15 %) $44,018.70 <br />Total $337,476.70 <br />