Laserfiche WebLink
• Provide gate valves an all three sides of watermain tee located at intersection of <br /> service road and Yankton St. <br /> • Extend watermain to station 5+00 and install a hydrant assembly on end of line. <br /> • Water service appears undersized to accommodate a fire suppressant system within <br /> the building. Verify required size with architect and mechanical engineer. <br /> • Provide documentation showing the wetland boundary has a current certified <br /> delineation. <br /> • Please extend the sidewalk to the cul-de-sac. <br /> Environmental <br /> ® Proposed stormwate systems will need to adhere to the new NPDES permit <br /> requirements for stormwater <br /> ® Yankton street, the sidewalk, and the detention pond encroach into the wetland <br /> buffer. The T.E.P panel will need to review the plan for compliance. <br /> Security/ operations <br /> • There is some concern for the residents leaving the property and trying to wall-, <br /> along/ cross Highway 10. What security measures are in place for the residents? <br /> • How many employees are envisioned per shift? <br /> Bwldrng <br /> • As this project will be developed as PUD, a PUD agreement will need to be <br /> developed. A PUD allows flexibility from the strict requirements of the zoning <br /> code,with the tradeoff being a higher quality development. <br /> • Building plans should be developed by a licensed architect and include the building <br /> type, specifically,is this a nursing home or senior citizen housing? <br /> • The building design should echo the design elements of the adjacent West Oaks <br /> development in colors and materials. <br /> ® The sunroom as proposed faces the side of a building south,perhaps the interior <br /> could be adjusted to create more of a view. <br /> Landscaping <br /> • Landscaping is required at a rate of 1 tree per 40 feet on lot perimeter,plus 3. For <br /> this lot, the perimeter is 1123 feet, requiring 31 trees. <br /> • Headlight screening is required adjacent to the parking lot along the south property <br /> line. <br /> • The placement of any trees in the easement area will need to be evaluated with the <br /> easement language. <br /> • Landscaping plan must be prepared by a registered landscape architect. <br /> • Sheet 10, dated 7/29/2013,reflects the intent to seed or sod certain areas around the <br /> building. Please specify. <br /> • The property will need to be irrigated. <br />