Laserfiche WebLink
A4h <br /> Elk River t <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission David Berg—Water Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> September 10, 2013 6.1 <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> Angela and Pete have been working on hydrant maintenance and helping Bolton and Menk find <br /> water valves that have been covered with dirt or black top. We are doing this to bring our water maps up- <br /> to-date with coordinates for all valves. Some of the valves were unable to be located as the GPS crew was <br /> shooting points,however we will continue to work to find the coordinates. <br /> Angela has been training Mike and Gene on GPS to assist them with the long-term mapping <br /> project. She has also approved another customer to the SMART Irrigation Rebate. <br /> The Freeport Water Tower painting is nearly finished. Eric deserves a lot of credit as he has put <br /> in significant amounts of time to make sure all of the specs have been followed. <br /> In IIIEAFI IY <br /> Page I of I NATURE <br /> PowerPro wider <br /> P OW EREO TO SFRVf <br /> 107 <br />