My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. ERMUSR 09-10-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2013
>
09-10-2013
>
5.4. ERMUSR 09-10-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2013 10:50:34 AM
Creation date
9/12/2013 10:50:34 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/10/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELECTRIC RULES <br /> INTEGRITY TESTING <br /> New large demand customers or existing large demand customers that have installed new <br /> production equipment and conduct tests to determine the integrity of their production <br /> equipment and/or electrical system or Elk River Municipal Utilities (ERMU) electric distribution <br /> system can have a significant financial impact on their power bill especially if all equipment is <br /> energized simultaneously. It can also have a significant financial impact on ERMU's wholesale <br /> power bill if such testing coincides with the hour the monthly billing peak is established. To <br /> discourage the practice of performing integrity testing during on-peak hours, ERMU will offer <br /> new large demand customers or existing large demand customers that have installed new <br /> production equipment an incentive to conduct all integrity testing during off-peak hours. That <br /> incentive will come in the form of an agreement to waive the demand charge associated with <br /> the additional peak created by integrity testing providing the following are observed: <br /> 1. The term large demand customer applies to any business or facility that places a demand <br /> of one megawatt (1000 kW) or more on Elk River Municipal Utilities distribution system. <br /> Multiple facilities under a common name or ownership cannot aggregate to meet the <br /> minimum demand required to qualify for this offer. <br /> 2. The term off-peak hours refers to the six hours from midnight to 6 AM any weekday, or <br /> the ten hours from midnight to 10 AM any weekend day. <br /> 3. 24 hour notice that integrity testing will be conducted will be forwarded to ERMU by <br /> contacting 763-441-2020 to assure there are no extenuating circumstances that such tests <br /> should not be performed on that day. Such permission shall not unreasonably be <br /> withheld. <br /> 4. Initial startup refers to equipment and/or facility testing that is typically performed to test <br /> the integrity of the electrical system serving the equipment or facility prior to the business <br /> opening their doors for business to the general public. It also refers to equipment and/or <br /> facility testing that may be performed to test the integrity of the electrical system serving <br /> equipment that has been added to an existing business. <br /> If all integrity testing is performed within the parameters described in items 1 through 4 above, <br /> ERMU will ignore all demand peaks established during those off-peak hours for the purposes of <br /> establishing the customer's monthly billing demand. However, should integrity testing occur <br /> during both on-peak and off-peak hours, no demand peaks and/or resultant billing demand will <br /> be waived for that month. <br /> 19 <br /> 95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.