Laserfiche WebLink
Elk River Municipal Utilities <br /> Water Utility <br /> Capital Projects(2014-2024) <br /> Wells <br /> Well 2 <br /> Rehab/Reconstruction 65,000 500,000 <br /> Pull Well Well 50.000 <br /> Well 3 <br /> Rehab/Reconstruction 100,000 <br /> vuC <br /> Pull Well <br /> Well 4 <br /> Re onstrudion <br /> Pull ll Well Well <br /> Wells <br /> Re onstructbn <br /> Pull ll Well Well <br /> Well 6 <br /> Rehab/Reconstruction <br /> Pull ll Well Well sax <br /> Liquid CMCdne Transition <br /> Roof <br /> Well? <br /> Rehab/Reconstruction <br /> Pull Well <br /> Well 8 <br /> Rehab/Reconstruction <br /> Pull Well 24,000 <br /> Well <br /> Re onstruction <br /> Pull ll Well Well 24,000 <br /> Other <br /> Construction of Filler Plant 2,Feed 9 3.500,000 <br /> New ClWellland Flouride Feed Pumps 65900 <br /> General Well Maintenance 3.000 3,000 3,000- 3,000 <br /> New Well Construction/Placeholder 25,000 25,000 25.000 25,000 25,000 25.000 25,000 <br /> (4)Well d0ers 20,000 3,000 <br /> Facility Repair 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 <br /> Well Generators 20,000 <br /> Miscellaneous 10,000 10,000 10,000 10.000 15.000 15,000 15.000 <br /> Towers <br /> Jackson Tower <br /> Structural Mts. <br /> Structural M(c. <br /> Gary M.Tower <br /> Pant/Sandblast 4,500 1,225.500 <br /> Structural Mto. <br /> Freeport Tower <br /> Paint/Sandblast 1,225,500 <br /> Structural Mtc. 3,500 4,500 <br /> Auburn Tower <br /> Paint/Sandblast 20.000 800,000 1,300,000 <br /> Structural ural Mt Mtc. 3,500 <br /> Johnson Tower <br /> Paint/Sandblast 300,000 <br /> Structural ural Mt c. <br /> Placeholder 15,000 15,000 15.000 15,000 <br /> System <br /> Rate Study(delayed) <br /> Removal Booster Station 20,000 <br /> High Zone Low Zone Conversion <br /> Water Main Construction 300,000 200,000 200,000 200,000 200,000 200,000 200,000 <br /> Reclaim Backwash Water protect 150,000 150,000 150,000 150,000 150,000 <br /> Water Main Repair 5,000 5,000 5.000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 <br /> Inventory/Equipment <br /> Meters/ERTs 10,000 10,000 10,000 10,000 10,000 10,000 5,000 5,000 5,000 5,000 5,000 <br /> Leak Dtector Hydrants/Valves 40,000 5,000 5,000 5,000 <br /> Leak Detector 5,000 <br /> Trucks 35,000 35,000 35,000 35,000 <br /> SCADA 5,000 5,000 5,000 5,000 5,000 <br /> CompulerslGlS 6,500 2,000 2,000 2,000 2,000 <br /> Misc. <br /> 20%share of Admin a Tech budgets 37,940 6,000 8,000 8,000 8,000 8,000 8,000 8,000 6,006 0,000 8,000 <br /> Less amounts budgeted as repairs and maintenance (100500) (47,000) (18,000) (10,000) (20,000) (8,000) (22,000) (13,000) (20.000) (7,000) (22,000) <br /> Less amounts from trunk funds (280.000 00 (100,000.00) (400,000.00) <br /> Total WATER CIP(2011 Dollars) 417,940 851,500 121,500 346,500 3,768,000 1,083,000 1,448,000 253,000 1,438,500 288,000 1,588,000 <br /> Inflated Dollars as 3% 877,045 128,899 378,830 4,240,917 1,255,494 1,7211,988 332,931 1,968,887- 381,448 2,321,023 <br /> 0 877,045 128,899 378,630 4,240,917 1,255,494 1,726,968 332931 1,968,687 381,448 2,321923 <br /> -417,940 25,545 7,399 32,130 472,917 172,494 280,988 79,931 530,187 113,448 753,023 <br /> Assessments-5 yrs.7%) <br /> Assessments-5 yrs.7%) <br /> Assessments-5 yrs,7%) <br /> Total Assessment Income 0 0 0 0 0 0 0 0 0 0 0 <br /> Notes <br /> 52 <br />