My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. ERMUSR 05-11-2004
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2004
>
05-11-2004
>
6.2. ERMUSR 05-11-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2013 2:25:41 PM
Creation date
9/10/2013 2:25:40 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/11/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MARCH 17,2004 <br /> Assumptions <br /> 1. Permitting support will include up to 24 hours of office support by a qualified ASR <br /> engineer or hydrogeologist. One (1) day-long meeting associated with permitting <br /> support is included in the estimated budget, and will be attended by one qualified <br /> ASR engineer or hydrogeologist. <br /> 2. Ten (10) copies of the draft testing plan will be provided to HRG for distribution the <br /> ERMU and the various regulatory reviewers. Twenty(20) copies of the final testing <br /> plan will be produced and provided to HRG for distribution. <br /> 3. Chris Catlin, P.E., Howard R. Green, will stamp any documents as the professional <br /> engineer in charge, if required by the regulatory agencies. <br /> 4. The project duration will not exceed 6 months from notice to proceed. <br /> 5. The budget does not include consideration of a monitoring well for the pilot testing <br />• plan <br /> 6. The budget does not include groundwater modeling <br /> 7. The cost of Future Phases of work is not included <br /> 8. Costs of water quality testing will be paid separately by ERMU, and are not included <br /> in the project cost. We will attempt to have MDH perform as many of the tests as <br /> possible, thereby reducing total project cost. <br /> Budget <br /> Compensation for the proposed services will be made based on labor hours at hourly rates <br /> plus expenses. The estimated cost is $45,000 <br /> Page 4 of 4 <br />