My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1 ERMUSR 02-10-2004
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2004
>
02-10-2004
>
6.1 ERMUSR 02-10-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2013 12:20:34 PM
Creation date
9/6/2013 12:20:33 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/10/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Electric Department—Glenn Sundeen/Line Superintendent <br /> Electric Department <br /> 1) Continued territory acquisition from Connexus Energy (see attached map). <br /> 2) Expanded electrical distribution system into West Oak, Hillside Estates #9, and Trott <br /> Brook South. <br /> 3) Rebuilt electrical system in 4th and 5th Street between Morton Ave. & Rush Ave. <br /> 4) Added 530 electric meters to electric system <br /> 5) Completed construction and energized Station 14 feeder expansion. <br /> 6) Constructed UG line on Co. Rd. 13 to prepare for future territory acquisition. <br /> 7) Purchased over 170 million KWH of energy with a peak day of 39.7 MW for an <br /> 7.93% increase. <br />
The URL can be used to link to this page
Your browser does not support the video tag.