My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1 - 5.2 PCSR 09-10-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2013
>
09-10-2013
>
5.1 - 5.2 PCSR 09-10-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2013 12:57:54 PM
Creation date
9/6/2013 12:11:16 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
9/10/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 12, 2013 <br /> Ms. Marilyn VanPatten <br /> 10451 175th Ave NW <br /> Elk River, MN 55330 <br /> Re: Heritage Maples: <br /> Preliminary and Final Plat <br /> Conditional Use Permit <br /> Dear Ms. VanPatten, <br /> At the Site Plan Review Committee meeting on August 2, staff reviewed your application <br /> and has a number of comments. <br /> Engineering/ Water <br /> • Drainage calculations provided do not follow the requirements of the 2013 MPCA <br /> Construction Stormwater Permit. Major changes to the new permit include but are <br /> not limited to the drainage volumes leaving the site not exceeding predevelopment <br /> volumes and ATLAS 14 precipitation data is to be used for all events. Please review <br /> the new requirements on the MPCA website at: <br /> http://www.pca.state.mn.us/index.php/water/water-types-and- <br /> programs/stormwater/construction-stormwater/mpca-to-re-issue-construction- <br /> s tormwater-general-p ermit.html <br /> • Please show adjacent property contour information to better identify how water is <br /> projected to leave the site.The east side appears to go south across the property line. <br /> • Desired minimum depth for all catch basins to be located in a public street is 4.0- <br /> feet. Minimum allowable is 3.0-feet. <br /> • Per drawings dated 08/06/2013, there appears to be a low point proposed to be <br /> graded into the TH 10 ditch near proposed station 2+75.Adjust to assure positive <br /> drainage is maintained along the TH 10 south ditch line. <br /> • Contours of proposed detention pond cannot extend into the proposed sidewalk. <br /> • Access should be provided off the east end of the parking area to the temporary cul- <br /> de-sac to facilitate parking movements in and out of the last two provided <br /> stalls. Alternatively, a parking bump out could facilitate necessary internal <br /> maneuvering. <br /> • No trash enclosure is shown. Trash enclosure should be constructed of stone or <br /> rough faced block,with cedar sided gates. <br />
The URL can be used to link to this page
Your browser does not support the video tag.