Laserfiche WebLink
7/Z it 3 <br /> PROJECT NARRATIVE <br /> HERITAGE MAPLES <br /> ELK RIVER, MINNESOTA <br /> Project Description: <br /> Heritage Maples Land Development is proposing the Heritage Maples Senior residential development on <br /> the 10+ acre triangle parcel located adjacent to Highway 10 on the South Service Road between Raven <br /> Lane and Waco Street NW. Heritage Maples will be on the PUD already established. The three acres to <br /> the east will be the first to be utilized with a Senior Memory Unit or Advanced Care Building. The Plans <br /> for the additional acreage will be used to build an Assisted Living Residence with capacity of 60 or more <br /> apartment units. Because of the properties'location and current market demand it was envisioned that the <br /> site should be developed as a senior living age 55 plus development with mix of housing types to take <br /> advantage of the natural topography and ecological features within and surrounding the site. The site will <br /> provide an attractive residential enclave surrounded by natural and recreational enjoyment with spacious <br /> and scenic views. <br /> As a PUD the development incorporates the following design" <br /> 1. 3 types of residential housing units utilizing a slab on grade design. <br /> 2. Clustering of units to preserve existing wetlands and wildlife areas <br /> 3. Clustering the residential units minimizes the amount of road that is needed and lessens <br /> impacts to the surrounding area. <br /> 4. Providing enhanced mitigation areas for stormwater management <br /> 5. A plaza area is provided for a central gathering area and passive recreation. <br /> 6. Enhanced landscaping with a mix of overstory,understory and coniferous trees along with <br /> building foundation plantings. <br /> 7. Landscaped bermed areas along the South Service Road to provide screening from traffic. <br /> 8. Proposed Monument sign at the entrance of the development. <br /> 9. The proposed residential building will be occupied 24 hr.per day <br /> 10. Employee count will vary on occupancy from 6 to 20 Employees for 3 shifts. <br />