Laserfiche WebLink
Elk River Municipal Utilities <br /> SCADA System Input/Output Water&Electric <br /> Current <br /> SCADA <br /> Number Location Device Digital Analog Tag Meter Status <br /> 6 Well#6 <br /> Well#6 Well Pump on/off 1 yes <br /> AB Chlorine Boster Pump on/off 1 no <br /> Potassium Permanganate Pump oNoff 1 no <br /> Othropolyphosphate Pump on/off 1 <br /> no <br /> Plant Flow Rate 1 no <br /> System Pressure 1 no <br /> Chlcnre Alarm 1 <br /> no <br /> Door Alarm 1 <br /> no <br /> Spare 5 3 <br /> 11 5 <br /> 7 Well#7 <br /> Well#7 Well Pump on/off 1 yes <br /> AB Chlorine Boster Pump on/off 1 no <br /> Potassium Permanganate Pump oNoff 1 no <br /> Othropolyphosphate Pump on/off 1 no <br /> Plant Flow Rate 1 no <br /> System Pressure 1 no <br /> Chlorine Alarm 1 no <br /> Door Alarm 1 <br /> no <br /> Spare 5 3 <br /> Well#8(future) Well Pump on/off 1 <br /> Plant Flow Rate 1 <br /> System Pressure 1 <br /> 12 7 <br /> 8 Johnson St Water Tower <br /> Water Tower Level&System Pressure 1 Yes <br /> AB High Level Alarm 1 yes <br /> Low Level Alarm 1 yes <br /> High LevelSettings 1 yes <br /> Low Level Setting 1 yes <br /> Well Pump On 1 <br /> yes <br /> Well Pump Off 1 yes <br /> Door Contact 1 no <br /> Spare 15 9 <br /> 18 12 <br /> • <br /> Page 3 of 6 <br />