My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.8. PCSR 09-28-2004
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2004
>
09-28-2004
>
5.8. PCSR 09-28-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2013 11:31:37 AM
Creation date
8/28/2013 11:29:52 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
9/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the intersection. Three of the offstreet parking spaces affected are on private property <br /> and these would be impacted by relocating the interior circulation patterns. <br /> 5. Utility impacts include installation of a new catch basin, relocation of a light pole and <br /> adjustment of a manhole cover. It is not know at this time what underground utility <br /> relocations may be needed. <br /> 6. The sidewalk in the area of the turn lane would be removed and relocated along the curb <br /> line. The construction of the new walk would most likely be pavers to match the existing <br /> Mainstreet walks. <br /> 7. Signage and pavement marking to show the new turn lane would be needed <br /> 8. The street section is not know at this time, it was assumed to be 2 inches of bituminous <br /> wear, 5 inches of bituminous base and 10 inches of class 5 aggregate base <br /> 9. The surface of the pork chop island was assumed to be finished in concrete to match the <br /> existing island in the center of Mainstreet. <br /> 10. It appears no right of way needs to be acquired for the construction of this turn lane. <br /> Estimated Project Costs <br /> An estimate of construction costs was prepared and is attached to this memo. The following is <br /> a breakdown of the estimated project costs: <br /> Jackson Avenue Parish Avenue Total <br /> Construction Cost $ 5,000 $61,000 $66,000 <br /> Contingency (10%) $ 500 $ 6,100 $ 6,600 <br /> Overhead (25%) $ 1,250 $15,250 $16,500 <br /> Total $ 6,750 $82,350 $89,100 <br /> O:\PROJ\813320J\0325Unem060104 Jackson and Parish Right turn lanes.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.