My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.8. PCSR 09-28-2004
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2004
>
09-28-2004
>
5.8. PCSR 09-28-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2013 11:31:37 AM
Creation date
8/28/2013 11:29:52 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
9/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bluff Block <br /> September 22,2004 Page 2 <br /> 4. Sanitary sewer and water facilities are available for the redevelopment in this plat from <br /> Main Street. Therefore,the existing sanitary sewer services which flow southerly to the <br /> river bank sewer line will need to be properly abandoned. <br /> 5. There are existing small utility lines along the west edge of the preliminary plat which run <br /> from Main Street to the existing facilities along the south line in Outlot A. A <br /> determination will need to be made before the final plat whether or not these small <br /> utilities can stay in place. If they will remain in place, the appropriate easements will <br /> need to be provided on the final plat. If they are not to stay in place, documentation that <br /> there is somewhere for them to be relocated and an agreement from the utilities to re- <br /> locate their facilities should be a condition of the final plat. <br /> If you have any questions regarding any of these comments, please call. <br /> Sincerely, <br /> Terry J. aurer, P.E. <br /> City Engineer <br /> S:\PLANNING\Case Files\2004\P 04-20 Bluff Block\Engineer's memo 9-22-04.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.