Laserfiche WebLink
5. There is also a public storm sewer system which runs from the northwest corner <br /> diagonally across the site to two catch basins in the center island. This is to drain the <br /> existing parking lot. Will this entire facility be removed and no longer needed, or will it <br /> be re-routed and used to drain the storm drainage from the rooftop and parking area of <br /> the proposed building. This question will need to be answered and appropriate <br /> easement provided if necessary before the final plat is approved. <br /> 6. This preliminary plat should be reviewed by MnDOT since it has frontage along Trunk <br /> Highway 10 to determine if they have any comments. <br /> 7. Since this site is under one acre in size,when a development occurs on this plat it will <br /> not be required to obtain an NPDES construction permit,however, since erosion and <br /> sediment control is a major concern, especially in the downtown area, any development <br /> on this plat should be required to adopt the City's general Storm Water Pollution <br /> Prevention Plan (SWPPP) and follow it prior,during, and after construction. <br /> If you have any questions regarding these comments,please call. <br /> Sincerely, <br /> Terry J. Maurer,P.E. <br /> City Engineer <br /> S:\PLANNING\Case Fifes\2004\P 04-19 Jackson Mock\Engineer's memo 9-22-04.doc <br />