My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3B SR 08-19-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
08-19-2013
>
4.3B SR 08-19-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2013 8:11:51 AM
Creation date
8/16/2013 7:25:44 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/19/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ELK RIVER PAY ESTIMATE NO. 2 <br /> 13065 Orono Parkway FROM: July 1,2013 <br /> Elk River, MN 55330 TO: July 30, 2013 <br /> Bailey Point Nature Preserve Parking Lot CONTRACTOR: Brenteson Companies, Inc. <br /> August 13th,2013 20300 166th Street <br /> Big Lake , MN 55309 <br /> CONTRACT ITEMS THIS PERIOD TOTAL TO DATE <br /> ITEM <br /> NO. DESCRIPTION UNIT QTY. UNIT QTY. AMOUNT QTY. AMOUNT <br /> PRICE <br /> 1 Mobilization LS 1 $3,440.00 0 $0.00 1 $3,440.00 <br /> 2 Rock Construction Entrance EA 1 $1,222.50 0 $0.00 0 $0.00 <br /> 3 Remove/Salvage Fence LF 50 $4.80 0 $0.00 20 $96.00 <br /> 4 Silt Fence LF 600 $4.00 0 $0.00 0 $0.00 <br /> 5 Inlet Protection EA 2 $542.00 0 $0.00 2 $1,084.00 <br /> 6 Bio Rolls LF 20 $5.40 0 $0.00 415 $2,241.00 <br /> 7 Sawcut Concrete or Bituminous pavement LF 60 $3.50 0 $0.00 60 $210.00 <br /> 8 Bituminous Pavement removal,replace, SF 100 $17.80 0 $0.00 0 $0.00 <br /> 9 Common Excavation LS 1 $1,400.00 0 $0.00 1 $1,400.00 <br /> 10 Salva e/Res read topsoil LS 1 $1,360.00 0 $0.00 1 $1,360.00 <br /> 11 Swale Grading LS 1 $100.00 0 $0.00 1 $100.00 <br /> 12 B612 Concrete Curb and Gutter LF 550 $14.30 13 $185.90 553 $7,907.90 <br /> 13 Concrete Pedestrian Ramp EA 1 $770.00 0 $0.00 1 $770.00 <br /> 14 Rip Rap with Membrane LS 1 $575.00 1 $575.00 1 $575.00 <br /> 15 Place Cl 7 Agg. CY 381 $15.55 253 $3,934.15 603 $9,376.65 <br /> 16 Turf Establishment SY 630 $0.90 1180 $1,062.00 1180 $1,062.00 <br /> 17 Erosion Control Blanket SY 630 $1.00 1180 $1,180.00 1180 $1,180.00 <br /> 18 Sub grade Ex CY 1300 $1.85 188 347.80 248 458.80 <br /> 19 Granular Borrow(cv) CY 1300 $10.00 (60.00) (600.00) - - <br /> Total $6,684.85 $31,261.35 <br /> TOTAL THIS PERIOD <br /> AMOUNT EARNED $31,261.35 <br /> AWARDED CONTRACT AMOUNT $45,081.05 <br /> AMOUNT RETAINED(5%) $ 1,563.07 <br /> PREVIOUS PAYMENTS $23,347.68 <br /> AMOUNT DUE $ 6,350.60 <br /> I hereby certify that all items and amounts shown by this pay estimate are correct for the work completed to date. <br /> CONTRACTOR: ENGINEER: <br /> Brenteson Companies,Inc. Justin Femrite,P.E. <br /> BY: BY: <br /> DATE: DATE: <br /> Approved by Owner/Commission <br /> CITY OF ELK RIVER,MINNESOTA <br />
The URL can be used to link to this page
Your browser does not support the video tag.