My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.7. SR 08-05-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
08-05-2013
>
4.7. SR 08-05-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2013 9:18:40 AM
Creation date
8/1/2013 4:48:21 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/5/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C1, I9oes floe plan document each jurisdiction's existlin�g authorities, Flooding- <br /> ,, pcwllcies, prograrrns and rs�uarc�s and its ability to expand on and MaaNtijurisdcto�rral <br /> improve these existing policies and programs?(Requirement Concerns, Fop,4-25. <br /> §201,6(c)(3)) Existing authorities <br /> primarily deal with the <br /> ,flood'hozord; <br /> ordinances and <br /> structural restrictions <br /> in the floodway and <br /> flood fringe districts <br /> are en orced. _.._.....__' <br /> C . Does the Plan addres s <br /> - each jurisdiction's participation in the NFIP Sable 4-9:Sherburne X <br /> and continued compliance with:NFIP requirements,as appropriate? County Communities <br /> (Requirement§2tt1 6(c)(3)(NN)) Participating in the <br /> NFIP. The county, the <br /> cities of Becker, Big <br /> Lake, Clear Labe, Elk <br /> River,Zimmerman, St. <br /> Claud,crud Princeton, <br /> and the Township of <br /> Pecker participate in <br /> the NFIP. <br /> C3. Does the Plan include goals to reduce/avoid long-term Table 5-1:Mitigation X <br /> vulnerabRities to the Identified hazards?(Requirement Strateg'i'es for All <br /> Hazards.The plan <br /> contains 1 <br /> overarching goals far <br /> mitigation, <br /> Additionally, each <br /> hazard has its own set <br /> of goals. <br /> C4, goes the Plan identify and analyze a comprehensive range of Mitigation Strategies, X <br /> specific mitigation actions and projects for each jurisdiction being pp,5-18;5-21, <br /> considered to reduce the effects of hazards,with emphasis on new Protection of <br /> and existing buildings and Infrastructure?(Requirement infrastructure within <br /> §261.6(c)(3)(ll)) each Jurisdiction is <br /> discussed in terms of <br /> dam failure and <br /> flooding, <br /> C5, Does the Flan contain an action plan that describes how the Mitigation Strategies, X <br /> actions identified will be prioritized(including cost benefit review), pp.5-2:5-21. <br /> implemented,and administered by each jurisdiction?(Requirement Estimated cost, <br /> §201.6(c)(3)(Nv))i(Requirement§201_6(c)(3)(NNi)) estimated benefit and � <br /> potential funding <br /> sources administered <br /> by each Jurisdiction is <br /> listed'under every <br /> action. <br /> Local Mitigation Plan Review Tool ,-51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.