My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.11. & 6.12. SR 05-20-2002
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2002
>
05/20/2002
>
6.11. & 6.12. SR 05-20-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:31:51 AM
Creation date
6/28/2002 7:57:10 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/20/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Michele McPherson <br />April 17, 2002 <br />Page Two <br /> <br />Detailed storm drainage calculations were not submitted with this development. <br />Storm sewer calculations will need to be submitted, reviewed, and approved prior <br />to final approval of Kliever Lake Fields East Addition. The high water elevation and <br />emergency overflow elevation for the proposed ponds are shown on the grading <br />plan. The emergency overflow elevation is shown at 901.0. According to City <br />policy, the lowest opening on any adjacent building needs to be a minimum of one <br />foot above the emergency overflow. Every building on the south side of Street A is <br />shown lower than this elevation at 900.5. These need to be revised. <br /> <br />Bryan Adams of the Elk River Municipal Utilities has asked for the watermain on <br />Street A and the unnamed street accessing Fillmore Street to be increased in size <br />from 8-inch to 10-inch. As done previously with Kliever Lake Fields Addition, there <br />will be a trunk watermain credit given back for the increase in size between 8-inch <br />and 10-inch. <br /> <br />It will be necessary to determine the depth of sanitary sewer needed at the <br />southeast part of the plat at a later date. We will work with the Developer's <br />Engineer when they prepare final construction drawings. <br /> <br />If you have any questions regarding these comments, please call. <br />Sincerely, <br /> <br />Howard R. Green Company <br /> <br />Terry J. rvlaurer, P.E. <br /> <br />TJM:tw <br /> <br /> Howard R, Green Company <br />Ltr 4-17-02 McPherson.doc CONSULTING ENGINEERS <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.