Laserfiche WebLink
Outlots [ <br /> ! <br />Four outlots are proposed on the south side of County Road 33.6utlot A is about 43 acres, <br />it consists of wetland and an area that will be used for wetland mitigation; Outlot B is 4.22 <br />acres and will be utilized for a drainage pond and neighborhooc~ park; Outlot C is 37.47 <br />acres and contains the community septic system, and Outlot D is ~9.67 acres and is about 3A <br />wetland. <br /> <br />Outlot E is 25.96 acres and is located on the north side of County Road 33. This outlot will <br />be dedicated as a city park. The NSP power line easement cuts dia{:onally across this outlot. <br /> <br />Park Dedication <br /> <br />Outlot E and a small cash contribution will be accepted to fulfill the park dedication <br />requirements. <br /> <br />Well and Septic <br /> <br />The project will have a community septic system and individual w~lls. The septic system will <br />be located on Outlot C. <br /> <br />Recommendation <br /> <br />Staff recommends that the City Council approve Resolution No <br /> 02- <br /> granting <br /> final <br />plat approval for Windsor Park 3rd Addition with the following~ <br /> conditions: <br /> <br /> 1. A DEVELOPERS AGREEMENT OUTLINING THE TERMS ~kND CONDITIONS OF <br /> THE PLAT APPROVAL AND INSTALLATION OF IMPROVEMENTS BE PREPARED <br /> AND EXECUTED PRIOR TO RELEASING THE PLAT FOR4 RECORDING. <br /> <br /> 2. ALL COMMENTS OF THE CITY ENGINEER BE SHALL BE ADDRESSED. <br /> <br /> 3. A HOMEOWNERS ASSOCIATION DOCUMENT BE PREPARED SUBJECT TO THE <br /> CITY ATTORNEY'S REVIEW AND APPROVAL PRIOR TO FINAL PLAT. <br /> <br /> 4. STREET LIGHTS BE INSTALLED AS REQUIRED BY ELK RIVER UTILITIES <br /> <br />5. A LETTER OF CREDIT BE PROVIDED TO THE CITY IN THE AMOUNT OF 100% <br /> OF THE COSTS OF THE PUBLIC IMPROVEMENTS. i <br />6. UPON COMPLETING ALL OF THE IMPROVEMENTS AND HAVING THEM <br /> ACCEPTED BY THE CITY, A WARRANTY BOND IN THE AMOUNT OF 25% OF THE <br /> IMPROVEMENT COSTS SHALL BE SUBMITTED TO THE ~ZITY FOR THE PERIOD <br /> OF ONE YEAR. <br /> <br />ge <br /> <br />o <br /> <br />SURFACE WATER MANAGEMENT FEE IN THE AMOUNI <br />CITY AT THE TIME OF FINAL PLAT BE PAID PRIOR TO <br />FOR RECORDING. <br /> <br />A SEALCOAT FEE IN THE AMOUNT TO BE DETERMINE] <br />ENGINEER BE PAID PRIOR TO RELEASING THE PLAT F~ <br /> <br /> REQUIRED BY THE <br />{ELEASING THE PLAT <br /> <br />) BY THE CITY <br />)R RECORDING. <br /> <br /> <br />