My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5. EDSR 07-15-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2003-2013
>
2013
>
07-15-2013
>
5. EDSR 07-15-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2013 11:48:33 AM
Creation date
7/11/2013 4:19:18 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
7/15/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preferred Powder Coating is a metal powder coating company that prides <br /> itself in environmental preservation and conservation, ensuring their work is <br /> done in an environmentally sensitive manner through a process known as <br /> EEP, or"Enhanced Performance Pretreatment" which was developed to meet <br /> the new phosphate restrictions, reduce water usage, lower chemical <br /> consumption and eliminate the natural gas needed to heat the stage. <br /> Preferred Powder Coating works with all types of ferrous and non-ferrous <br /> substrates including steel, aluminum, stainless, cast iron and zinc die <br /> castings. Preferred Powder works with a variety of industries that require <br /> premium powder services including, but not limited to: aeronautics, athletic <br /> equipment, automotive, die casting, medical equipment, OEM, recreational, <br /> retail and sheet metal. <br /> Please give a brief summary of the project: <br /> Currently located in Rogers, MN in a 73,000 state of the art facility, <br /> Preferred Powder is looking to expand their operations and relocate to the <br /> City of Elk River. Elk River Economic Development Authority President Dan <br /> Tveite and Elk River economic development staff toured the facility with <br /> President Lloyd Peterson and Vice President of Operations Dan Bosshart to <br /> learn more about the company in late 2012. <br /> Preferred Powder currently employs 24 employees, and plans on creating 8- <br /> 10 jobs within the next two years. They plan on constructing a 100,000 <br /> square foot facility which will not only increase Elk River's tax base; it will <br /> also generate excitement and momentum for the newly finished Nature's <br /> Edge Business Center, being as they will be the first to build in the park. <br /> Because of their operations, a rectangular shaped building is required to <br /> meet the needs of their equipment lay-out and maximize efficiency. This <br /> 10.36 acre site poses challenges not only with the wetlands, but the Northern <br /> Natural Gas line (approximately one acre) which runs North/South through <br /> the middle of the property. The existing encroachment agreement between <br /> the city of Elk River and Northern Natural Gas prohibits anything from <br /> being built over this gas main. Because of where the gas line is located, it <br /> leaves approximately six buildable acres to the west of the line, making it <br /> challenging to build an adequate building without impacting the existing <br /> wetlands. Preferred Powder has received approval from the TEP Committee <br /> for wetland mitigation. They have taken all steps required to build a 100,000 <br /> square foot facility on an extremely challenging lot. The four acres to the <br /> east of the gas main will not be built on, but is necessary to be utilized during <br /> site preparation. <br /> Please describe how this loan will impact your project: <br /> This loan will help offset the total costs of wetland delineation and site <br /> preparation necessary to appease the TEP requirements and to accommodate <br /> Page 1 1 oE', NATURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.