My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2. SR 07-15-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
07-15-2013
>
7.2. SR 07-15-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2013 2:35:46 PM
Creation date
7/11/2013 2:29:00 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/15/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I `I <br /> Preferred Powder Coating- Conditional Use Permit Narrative <br /> COMPANY BACKGROUND <br /> Preferred Powder Coating is a metal powder coating company that prides itself in environmental <br /> preservation and conservation, ensuring their work is done in an environmentally sensitive manner <br /> through a process known as EEP, or"Enhanced Performance Pretreatment which was developed to <br /> meet the new phosphate restrictions, reduce water usage, lower chemical consumption and eliminate <br /> the natural gas needed to heat the stage. Preferred Powder Coating works with all types of ferrous and <br /> non-ferrous substrates including steel, aluminum,stainless,cast.iron and zinc-die castings. Preferred <br /> Powder works with a variety of industries that require premium powder services including, but not <br /> limited to:aeronautics,athletic equipment,automotive,die casting, medical equiprnent,'GEM;• <br /> recreational, retail and sheet metal. <br /> SUMMARY OF PROJECT <br /> Currently located in Rogers, MN in a 73,000 state of the art facility, Preferred Powder is booking to <br /> expand their operations and relocate to the City of Elk River. Elk River Economic Development Authority <br /> President Dan Tveite and Elk River economic development staff toured the facility with President,Lloyd <br /> Peterson and Vice President of Operations Dan Bosshart to learn more about the company in late <br /> 2012.Preferred Powder currently employs 24 employees,and plans on creating 8-10 jobswithin the next <br /> two years.They operate one shift, six days a week from 5:30am-3:30pm, and overtime on the weekends <br /> as necessary: They plan on constructing a 100,000 square foot facility which will not only increase Elk <br /> River's tax base; it will also generate excitement and momentum for the newly finished Nature'..Edge <br /> Business Center, being as they will be the first to build in the park. <br /> Because of their operations, a rectangular shaped building is required to meet the needs.of-their <br /> equipment lay-out and maximize efficiency. This 10.36 acre site poses challenges not only.with the <br /> wetlands, butthe Northern Natural Gas line(.approximatelyone acre)which runs North/South through <br /> the middle of the property. The existing encroachment agreement between the city of Elk River and <br /> Northern Natural Gas prohibits anything from being built over this gas.main. Because of.where the gas <br /> line is located,it leaves approximately.six buildable acres to the west of the line, making it challenging to <br /> build an adequate building without impacting the existing wetlands. Preferred Powder has received <br /> approval from the TEP Committee for wetland mitigation: They have taken all steps required to build a <br /> 100,000 square foot facility on an extremely challenging lot. The four acres to the east of the gas main <br /> will not be built on, but is necessary to be utilized during site preparation. <br /> Because of the challenging site, and their building requirements to meet the needs of their operations, <br /> i PPC is proposing their dock doors to face one of the front yard setbacks which requires a Conditional <br /> Use Permit(CUP). Proposed parking provided is as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.