My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2 SR 07-01-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
07-01-2013
>
8.2 SR 07-01-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2013 9:27:21 AM
Creation date
6/28/2013 9:25:50 AM
Metadata
Fields
Template:
City Government
type
SR
date
7/1/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Scott Grass <br /> Director of Project Development <br /> Professional Experience: <br /> 2011—Present Railroad Controls Limited—Fort Worth,TX j <br /> Director of Project Development, (November 2011 —present) <br /> A Manage two Project Managers j <br /> ➢ Responsible for Project Bids that include Commuter Rail,Light Rail, <br /> PTC, CTC, Grade Crossings, Communications, and Fiber. <br /> A Daily communications with various Prime Contractors and Agencies <br /> in problem solving,negotiating pricing, scheduling, construction I <br /> activities, and contract terms/conditions. <br /> ➢ Put Change Orders together for changes that occur on existing <br /> projects. I <br /> ➢ Project site surveys. <br /> A Provide Bill of Materials and take offs for New Bids. j <br /> A Project tracking for future bids and proposals. <br /> A Filing and documenting of project bids, and contracts. <br /> 2010-2011 CSI&W—Sibley, LA <br /> Director of Signal Division <br /> ➢ Managed various subcontractors specializing in railroad signals, <br /> communications and traffic signals. In addition, coordinates in-service <br /> signal construction installations for CTC and highway grade crossing <br /> warning systems. <br /> ➢ Assist in the project management and organizations of various signal <br /> construction activities while maintaining the-budget and schedule <br /> according to design and product specifications. <br /> A <br /> Put Project together for Highway Grade Crossings, CTC,and <br /> Fiber projects. <br /> 2007-2010 Herzog Contracting Corporation—Irving, TX <br /> Systems Manager f <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.