My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.4. SR 07-20-1998
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1998
>
07/20/1998
>
6.4. SR 07-20-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:17 AM
Creation date
1/13/2004 6:23:15 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/20/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U S WEST Wireless, LLC. <br />426 North Fain/iew Avenue Room 101 <br />St. Paul, MN 55014 <br /> <br />respectively, while at the same time providing coverage to the surrounding <br />community in the heart of Elk River, a cell site was deemed necessary to be situated <br />in the vicinity of this location. To accomplish these coverage objectives our monopole <br />has been designed to be situated at a height of 150 ft. at the proposed location. <br /> <br /> Capacity.- CDMA technology has an inherent capacity advantage over <br />comparable (current) analog technologies.. A conservative calculation puts this <br />capacity advantage at six times for comparable operating bandwidths. For a 1.23 <br />MHz bandwidth ( the bandwidth to be utilized in US WEST's initial deployment), <br />about 1000 subscribers per site can be supported during busy hour (with an <br />acceptable call blocking probability). For the corridor along Hwy. 10 which SCL005A <br />is designed to cover, the Minnesota DOT gives the traffic volume as approximately <br />31,000 automobiles per day, on average. A reasonable estimate of initial customer <br />penetration puts the traffic carrying requirements for a particular US WEST site in this <br />vicinity at approximately 250 mobiles during busy hour which equates to at least one <br />PCS cell site. <br /> <br /> Interference: Our equipment manufacturer constructed our equipment to <br />comply with FCC mandated regulations, and we will not cause any interference to <br />any other broadcast systems. <br /> <br /> Site Selection:The site at 19050 Industrial Blvd. NW was selected because: (1) <br />drive test results indicated that this site fulfilled all our coverage requirements; (2) <br />mathematical analysis showed that it could meet the imposed capacity constraints. <br /> <br /> Please do not hesitate to contact me directly at (612)642-6039 should you have <br />any questions regarding the study. <br /> <br />Sincerely, <br /> <br />Khursheed Khan <br />RF Design Engineer <br /> <br />Access2TM Advanced PCSTM <br />Paging Services <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.