My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8. EDSR 06-17-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2003-2013
>
2013
>
06-17-2013
>
8. EDSR 06-17-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2013 11:59:28 AM
Creation date
6/14/2013 11:59:26 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
6/17/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Borrower must be located in the Downtown District(DD). <br /> Loans must be supported by sufficient collateral,which may include <br /> personal assets and guarantees. <br /> Energy Efficiency Improvement Program <br /> Purpose: The Energy Efficiency Improvements Program is available to <br /> property owners of commercial or industrial buildings in Elk River to <br /> provide capital to businesses to invest in energy efficiency and <br /> improve their profitability through reduced energy costs and enhance <br /> their ability to retain and create jobs. In addition, the program helps <br /> the city of Elk River use energy conservation as an economic <br /> development tool. <br /> Amount: Applicants may apply for the cost of improvements up to$74,999 <br /> Eligible Uses: Energy efficiency measures installed in or on a building include: <br /> • Facility systems optimization (commissioning/re-commissioning) <br /> • Facility systems control improvements <br /> • Process efficiency improvements (CenterPoint Energy) <br /> • Lighting efficiency improvements <br /> • Heating,ventilation and air conditioning system modifications <br /> • Exterior envelope improvements <br /> • Motor and pump efficiency improvements <br /> • Ground-source heat pump systems used to heat or cool a facility <br /> • Installation of equipment or devices that use renewable energy <br /> sources to generate electricity or heat or cool a building including <br /> solar electricity (photovoltaic),wind turbine or solar thermal. <br /> Equity: Must have a minimum of 10% equity provided by the borrower. <br /> Rate: Fixed;2 points below the lowest prime rate published in the Wall S <br /> treet Journal the day the loan is closed, or 3%,whichever is greater. <br /> Term: The maximum maturity date will be determined by the useful life of <br /> the improvement and the energy payback achieved. For projects that <br /> have a shorter length of payback(2-5) years as calculated according <br /> to energy savings, the loans will have an initial maturity of up to 5 <br /> years from the date of closing. Longer life improvements (6-15 <br /> years) may apply for a longer maturity of up to 10 years. <br /> Criteria: Applicant must agree to energy audits conducted under the utility <br /> company's Conservation Improvement Program(CIP). If warranted, <br /> engineering studies then are performed on facilities with conservation <br /> Page 4of15 r I a E H E 1 1 ► <br /> NAME <br />
The URL can be used to link to this page
Your browser does not support the video tag.