Laserfiche WebLink
RD B�=� TYPICAL SECTION <br />BENIND cu. (ttP PUBLIC STREET <br />D• NO <br />t5' <br />tt1P5g4 SEED k uuC <br />1 ___jfP6EN OtDiA 3 <br />6• coxasTE <br />MI <br />.N - ---7 -- N. s <br />... cE s Acct <br />CONRCREtE CURB tl41C: <br />AND 86te CONCRETE CURB AND CUTTER <br />i0P OF CURB ALL BE PLACED ARCUND NAX, <br />0' gFLOW <br />AT ME ENDS OF DRIVES, AND <br />STREET'[ NEAR STDRM SEWER STRUCTURES, <br />PAVEMENT SECTION <br />1 NY NWSNi�<N LOAN COURSE, MVWE 45035C <br />R" B TUM NOUS BASE COURSE. -W 350350 <br />TYPICAL SECTION <br />BLOCK NO. <br />�-- VARIES -+ <br />2. EACH PHASE WALL CONSIST OF THE GRADING SEQUENCE OUTUNED BELOW. <br />I(FRONT SETBACK) <br />LOT N0. <br />DRIVEWAY <br />HOUSE TYPES <br />I °,� <br />SOG -SLAB ON GRADE <br />2r 0 -� <br />3 <br />28.0 <br />E <br />BEHIND CURB ( *w <br />I E DRAINAGE & UTILITY- <br />EASEMENT <br />4. STRIP TOPSOIL, STOCKPILE AND STABILIZE IN BERM FOR FUTURE SPREADING. <br />C E t /.' <br />PIDN FDCT <br />iD <br />2 <br />6" TOPBgL SEED k uuCCx <br />Tw <br />FINISHED GROUND <br />ELEVATION <br />7 <br />6. ALL SOILS WALL BE COMPACTED PER SPECIFICATIONS. <br />POSITIVE SLOPE TO A CURB AND GUTTER SYSTEM, STORM SEWER INLET, DRAINAGE DITCH, OR <br />7. MAINTAIN DRAINAGE DURING GRADING OPERATION TO TEMPORARY SEDIMENT BASIN. <br />8. COMPLETE SITE GRADING PER PLAN. <br />IT <br />LOWEST FLOOR <br />3. THE NORMAL WETTED PERIMETER OF ANY DRAINAGE DITCH MUST BE STABILIZED WITHIN 200 <br />10. MAINTAIN DRAINAGE TO TEMP SEDIMENT BASIN UNTIL NEXT PHASE BEGINS. <br />LINEAL FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE TO ANY <br />11. STA8IUZE DENUDED AREAS AND STOCKPILES WITHIN TIME FRAME LISTED IN EROSION PREVENTION <br />Nln. 3 a. s Acc. BASE <br />ELEVATION <br />4. PIPE OUTLETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION <br />m <br />WAIHIN 24 HOURS OF CONNECTION TO A SURFACE WATER. <br />GARAGE ELEVATION <br />9128 <br />AGENCY N.P.D.E.S. PERMIT, INCLUDING THE REQUIREMENT TO MINIMIZE THE AREA DISTURBED BY <br />Ar4DCCUTTER <br />GRADING AT ANY GIVEN TIME AND TO COMPLETE TURF RESTORATION THE TIME REQUIRED BY THE <br />1. SEDIMENT CONTROL PRACTICES MUST MINIMIZE SEDIMENT ENTERING SURFACE WATERS. DITCHES <br />PERMIT AFTER COMPLETION OF <br />I O <br />? D ow <br />s Tr <br />2. A COPY OF THESE PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN <br />MUST BE INSTALLED, AND THE SWPPP MUST BE AMENDED. THERE SHALL BE NO UNBROKEN <br />NUMBER OF STEPS <br />SOG <br />SLOPES MAY BE BROKEN WITH SILT FENCE, ROCK CHECK DAMS, COMPOST SNAKES, OR OTHER <br />3. BMPS REFER TO EROSION AND SEDIMENT CONTROL PRACTICES DEFINED IN THE MPCA <br />PROTECTING WATER QUALITY IN URBAN AREAS AND THE MINNESOTA CONSTRUCTION STE EROSION <br />APPROVED METHODS AND /OR AS SHOWN ON THE EROSION CONTROL PUN. <br />RECOMMENDED <br />2 SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON DOWNGRADE PERIMETERS BEFORE <br />4. ALL EROSION AND SEDIMENT CONTROL FACIUTIES (BMP'S) SHALL BE INSTALLED AND IN <br />UPGRADE LAND DISTURBING ACTIVITIES BEGIN. <br />OPERATION PRIOR TO LAND DISTURBANCE ACTIVITIES. SOME EROSION CONTROLS SUCH AS CHECK <br />PAVEMENT SECT10N <br />GARAGE SIDE <br />TERM ACTIVITIES. HOWEVER, THESE PRACTICES MUST BE INSTALLED BEFORE THE NEXT <br />AREA THEY SHALL BE MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR <br />NQH- <br />CHUTE 0.AAA <br />CUTTER <br />1.sNU IDUM.CUs DAR CDURBt, MVwE .5.1. <br />4. CONTRACTOR MUST PROTECT ALL STORM DRAIN INLETS BY APPROPRIATE BMP'S DURING <br />S. THE BMP'S SHOWN ON THE PLANS ARE THE MINIMUM REQUIREMENTS FOR THE ANTICIPATED SITE <br />ND <br />�6i81CB m ARwNO NAnll. <br />NEAP STOIiN� N£F IS RuA&S. <br />2• BITUMINOUS BASE COURSE, Lww 35035C <br />s- ass s AccRECATE BASE <br />COMPACTED suBDRADE <br />FNISHED ELEVATION <br />® LOT CORNER <br />F _ _ _ _ <br />z S <br />zA c <br />RD B�=� TYPICAL SECTION <br />BENIND cu. (ttP PUBLIC STREET <br />D• NO <br />t5' <br />tt1P5g4 SEED k uuC <br />1 ___jfP6EN OtDiA 3 <br />6• coxasTE <br />MI <br />.N - ---7 -- N. s <br />... cE s Acct <br />CONRCREtE CURB tl41C: <br />AND 86te CONCRETE CURB AND CUTTER <br />i0P OF CURB ALL BE PLACED ARCUND NAX, <br />0' gFLOW <br />AT ME ENDS OF DRIVES, AND <br />STREET'[ NEAR STDRM SEWER STRUCTURES, <br />PAVEMENT SECTION <br />1 NY NWSNi�<N LOAN COURSE, MVWE 45035C <br />R" B TUM NOUS BASE COURSE. -W 350350 <br />CE STREET - <br />LOT INFORMATION <br />(TYPICAL SECTION NOT TO SCALE) <br />z z z <br />F <br />0 0 0 0 <br />LOT PROFILE _ <br />DIRECDON OF FLOW _ <br />STREET PROFILES -- -- <br />DIRECTIONOW ON STREET <br />0.5 <br />0.5' <br />LOT BENCHING DETAIL <br />NO SCALE <br />PHASE SEQUENCE <br />CONSTRUCTION ACTIVITY REQUIREMENTS <br />BLOCK NO. <br />�-- VARIES -+ <br />2. EACH PHASE WALL CONSIST OF THE GRADING SEQUENCE OUTUNED BELOW. <br />I(FRONT SETBACK) <br />LOT N0. <br />I <br />HOUSE TYPES <br />I °,� <br />SOG -SLAB ON GRADE <br />L I- <br />-i <br />2. INSTALL CONSTRUCTION ENTRANCE <br />3. IN STALL PERIMETER SEDIMENT CONTROL DEVICES (SILT FENCE). <br />ERI <br />I <br />i E <br />CE STREET - <br />LOT INFORMATION <br />(TYPICAL SECTION NOT TO SCALE) <br />z z z <br />F <br />0 0 0 0 <br />LOT PROFILE _ <br />DIRECDON OF FLOW _ <br />STREET PROFILES -- -- <br />DIRECTIONOW ON STREET <br />0.5 <br />0.5' <br />LOT BENCHING DETAIL <br />NO SCALE <br />PHASE SEQUENCE <br />CONSTRUCTION ACTIVITY REQUIREMENTS <br />1, THE SIZE OF EACH FILL OPERATION SHALL BE LIMITED TO 10 ACRES PRIOR TO STABILIZATION. <br />2. EACH PHASE WALL CONSIST OF THE GRADING SEQUENCE OUTUNED BELOW. <br />A EROSION PREVENTION PRACTICES <br />1. THE CONTRACTOR SHALL IMPLEMENT CONSTRUCTION PHASING, VEGETATIVE BUFFER STRIPS, <br />GRADING ET I N.F <br />HORIZONTAL SLOPE GRADING, AND OTHER CONSTRUCTION PRACTICES THAT MINIMIZE EROSION. <br />1. DETERMINE SIZE OF FILL AREA BASED ON AVAILABLE SOIL <br />THE LOCATION OF AREAS NOT TO BE DISTURBED MUST BE DELINEATED (E.G. WITH FLAGS, <br />2. INSTALL CONSTRUCTION ENTRANCE <br />3. IN STALL PERIMETER SEDIMENT CONTROL DEVICES (SILT FENCE). <br />ERI <br />STAKES, SIGNS, STET FENCE, ETC.) ON THE DEVELOPMENT SITE BEFORE WORK BEGINS. <br />4. STRIP TOPSOIL, STOCKPILE AND STABILIZE IN BERM FOR FUTURE SPREADING. <br />2. ALL EXPOSED SOIL AREAS WITHIN 200 FEET OF A SURFACE WATER OR ANY STORMWATER <br />S. DIG TEMPORARY SEDIMENT BASIN, BASIN TO BE 1800 CF /ACRE OF AREA STRIPPED. CLEAN TEMP <br />CONVEYANCE SYSTEM WHICH IS CONNECTED TO A SURFACE WATER MUST BE STABILIZED <br />BASIN ONCE 50X FULL <br />WITHIN 7 DAYS. THESE AREAS INCLUDE POND S1DE SLOPES, EXPOSED SOIL AREAS WITH A <br />6. ALL SOILS WALL BE COMPACTED PER SPECIFICATIONS. <br />POSITIVE SLOPE TO A CURB AND GUTTER SYSTEM, STORM SEWER INLET, DRAINAGE DITCH, OR <br />7. MAINTAIN DRAINAGE DURING GRADING OPERATION TO TEMPORARY SEDIMENT BASIN. <br />8. COMPLETE SITE GRADING PER PLAN. <br />OTHER SYSTEM THAT DISCHARGES TO A SURFACE WATER. <br />9. RESPREAD TOPSOIL MAINTAIN A MINIMUM OF 4" DEPTH. <br />3. THE NORMAL WETTED PERIMETER OF ANY DRAINAGE DITCH MUST BE STABILIZED WITHIN 200 <br />10. MAINTAIN DRAINAGE TO TEMP SEDIMENT BASIN UNTIL NEXT PHASE BEGINS. <br />LINEAL FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE TO ANY <br />11. STA8IUZE DENUDED AREAS AND STOCKPILES WITHIN TIME FRAME LISTED IN EROSION PREVENTION <br />SURFACE WATER (WITHIN 24 HOURS OF CONNECTING TO A SURFACE WATER). <br />PRACTICES <br />4. PIPE OUTLETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION <br />GETNFRAI NOTES <br />WAIHIN 24 HOURS OF CONNECTION TO A SURFACE WATER. <br />1. CONTRACTOR TO ADHERE TO ALL REOIREMENTS OF THE MINNESOTA POLLUTION CONTROL <br />B. SEDIMENT CONTROL PRACTICES <br />AGENCY N.P.D.E.S. PERMIT, INCLUDING THE REQUIREMENT TO MINIMIZE THE AREA DISTURBED BY <br />GRADING AT ANY GIVEN TIME AND TO COMPLETE TURF RESTORATION THE TIME REQUIRED BY THE <br />1. SEDIMENT CONTROL PRACTICES MUST MINIMIZE SEDIMENT ENTERING SURFACE WATERS. DITCHES <br />PERMIT AFTER COMPLETION OF <br />AND SEDIMENT BASINS REQUIRE SEDIMENT CONTROL PRACTICES ONLY AS APPROPRIATE FOR <br />SITE CONDITIONS. IF DOWN GRADE SYSTEM IS OVERLOADED, ADDITIONAL UPGRADE PRACTICES <br />2. A COPY OF THESE PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN <br />MUST BE INSTALLED, AND THE SWPPP MUST BE AMENDED. THERE SHALL BE NO UNBROKEN <br />PROGRESS. <br />SLOPE LENGTH OF GREATER THAN 75 FEET FOR SLOPES WITH A GRADE OF 3:1 OR STEEPER. <br />SLOPES MAY BE BROKEN WITH SILT FENCE, ROCK CHECK DAMS, COMPOST SNAKES, OR OTHER <br />3. BMPS REFER TO EROSION AND SEDIMENT CONTROL PRACTICES DEFINED IN THE MPCA <br />PROTECTING WATER QUALITY IN URBAN AREAS AND THE MINNESOTA CONSTRUCTION STE EROSION <br />APPROVED METHODS AND /OR AS SHOWN ON THE EROSION CONTROL PUN. <br />AND SEDIMENT CONTROL PLANNING HANDBOOK. <br />2 SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON DOWNGRADE PERIMETERS BEFORE <br />4. ALL EROSION AND SEDIMENT CONTROL FACIUTIES (BMP'S) SHALL BE INSTALLED AND IN <br />UPGRADE LAND DISTURBING ACTIVITIES BEGIN. <br />OPERATION PRIOR TO LAND DISTURBANCE ACTIVITIES. SOME EROSION CONTROLS SUCH AS CHECK <br />3. THE TIMING OF SEDIMENT CONTROL PRACTICES MAY BE ADJUSTED TO ACCOMMODATE SHORT <br />DAMS AND TEMPORARY 9LT PONDS MAY BE INSTALLED AS GRADING OCCURS IN THE SPECIFIC <br />TERM ACTIVITIES. HOWEVER, THESE PRACTICES MUST BE INSTALLED BEFORE THE NEXT <br />AREA THEY SHALL BE MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR <br />PRECIPITATION EVENT EVEN IF THE ACTIVITY IS NOT COMPLETE <br />EROSION HAS PASSED. <br />4. CONTRACTOR MUST PROTECT ALL STORM DRAIN INLETS BY APPROPRIATE BMP'S DURING <br />S. THE BMP'S SHOWN ON THE PLANS ARE THE MINIMUM REQUIREMENTS FOR THE ANTICIPATED SITE <br />CONSTRUCTION UNTIL ALL SOURCES NTH POTENTIAL FOR DISCHARGING TO THE INLET HAVE <br />CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS <br />BEEN STABILIZED. <br />DICTATE THE PERMITTEE SHALL ANTICIPATE THAT MORE BMI WALL BE NECESSARY TO ENSURE <br />EROSION AND SEDIMENT CONTROL ON THE STE DURING THE COURSE OF CONSTRUCTION, IT IS <br />5. TEMPORARY STOCKPILES MUST HAVE SILT FENCE AROUND THE PERIMETER OF THE BASE OF <br />ME RESPONSBILITY OF THE PERMITTEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE <br />THE STOCKPILE AND CANNOT BE PLACED IN SURFACE WATERS, INCLUDING STORM WATER <br />CREATED BY CONSTRUCTION ACTIVITIES AND /OR CUMATIC EVENTS AND TO PROVIDE ADDITIONAL <br />CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, OR CONDUITS OR DITCHES. <br />ELI OVER AND ABOVE THE MINIMUM REQUIREMENTS SHOWN ON THE PLANS THAT MAY BE <br />NEEDED TO PROVIDE EFFECTIVE PROTECTION OF WATER AND SOIL RESOURCES. <br />6. CONTRACTOR MUST INSTALL TEMPORARY (OR PERMANENT) SEDIMENTATION BASINS WHERE TEN <br />6. ALL TREES NOT LISTED FOR REMOVAL SHALL BE PROTECTED. DO NOT OPERATE EQUIPMENT <br />OR MORE ACRES OF DISTURBED SOIL DRAIN TO A COMMON LOCATION AND /OR AS SHOWN ON <br />THE EROSON CONTROL PLAN. <br />WITHIN THE DRIP LINE, ROOT ZONES OR WITHIN TREE PROTECTION FENCE AREAS. <br />C. DEWATERING AND SURFACE DRAINAGE <br />7. WHEREVER POSSIBLE, PRESERVE THE EXISTING TREES, GRASS AND OTHER VEGETATIVE COVER TO <br />HELP FILTER RUNOFF. <br />1. DEWATERING OR ANY TYPE OF SURFACE DRAINAGE THAT MAY HAVE TURBID OR SEDIMENT <br />LADEN DISCHARGE WATER MUST BE DISCHARGED TO AN APPROVED SEDIMENT BASIN ON THE <br />B. OPERATE TRACK EQUIPMENT (DOZER) UP AND DOWN EXPOSED SOIL SLOPES ON FINAL PASS. <br />PROJECT SITE WHENEVER POSSIBLE. IF THE WATER CANNOT BE DISCHARGED TO A BASIN <br />LEAVING TRACK GROOVES PERPENDICULAR TO THE SLOPE DO NOT BACK- BLADE LEAVE A <br />PRIOR TO ENTERING THE SURFACE WATER, IT MUST BE TREATED WITH THE APPROPRIATE <br />SURFACE ROUGH TO MINIMIZE EROSION. <br />BMP'S SUCH THAT THE DISCHARGE DOES NOT ADVERSELY AFFECT THE RECEIVING WATER OR <br />DOWNSTREAM LANDOWNERS. THE CONTRACTOR MUST ENSURE THAT DISCHARGE POINTS ARE <br />9. TEMPORARY SEED SHALL BE DONE IN ACCORDANCE TO MNDOT 2575 A 387. <br />ADEQUATELY PROTECTED FROM EROSION AND SCOUR. THE DISCHARGE MUST BE DISPERSED <br />OVER NATURAL ROCK RIP RAP, SAND BAGS, PLASTIC SHEETING, OR OTHER ACCEPTED ENERGY <br />10. PERMANENT TURF RESTORATION SHALL BE DONE IN ACCORDANCE WITH MNDOT 2575 @ 3876. <br />DISSIPATION MEASURES. <br />11. SLOPES AT 3:1 OR STEEPER, AND /OR WHERE INDICATED ON THE PLANS SHALL BE SEEDED AND <br />2. ALL WATER FROM DEWATERING MUST BE DISCHARGED IN A MANNER THAT DOES NOT CAUSE <br />HAVE AN EROSION CONTROL BLANKET TYPE 3 INSTALLED OR MAY BE HYDROSEEDED WITH <br />NUISANCE CONDITIONS, EROSION, OR INUNDATION OF WETLANDS CAUSING SIGNIFICANT ADVERSE <br />TACKIFER MULCH. <br />IMPACT TO THE WETLAND. <br />12. THE CONTRACTOR SHALL REMOVE ALL SOILS AND SEDIMENT TRACKED ONTO EXISTING STREETS <br />D. INSPECTIONS AND MAINTENANCE <br />AND PAYED AREAS. <br />1. THE CONTRACTOR MUST APPOINT SOMEONE TO INSPECT THE CONSTRUCTION SITE ONCE EVERY <br />13. IF BLOWING DUST BECOMES A NUISANCE. THE CONTRACTOR SHALL APPLY WATER FROM A TANK <br />SEVEN DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT <br />TRUCK TO ALL CONSTRUCTION AREAS <br />OF GREATER THAN 0.5 INCHES IN 24 HOURS. ALL INSPECTIONS MUST BE RECORDED IN <br />WRITING AND RETAINED PER M.P.C.A. N.P.D.E.S. REQUIREMENTS. (NOTE: LOCAL JURISDICTION <br />14. WITHIN 7 DAYS OF COMPLETION OF THE SITE GRADING OPERATIONS THE ENTIRE SITE (EXCEPT <br />MAY REQUIRE A MORE FREQUENT INTERVAL OF INSPECTION.) <br />ROADWAYS) SHALL HAVE BEEN SEEDED AND MULCHED AND SILT FENCE SHALL INSTALLED <br />AROUND ALL PONDS. <br />E. POLLUTION PREVENTION MANAGEMENT MEASURES <br />15. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE PROPERLY DISPOSED OF <br />1. SOLID WASTE MUST BE DISPOSED OF PER M.P.C.A. REQUIREMENTS. <br />WITHIN THIRTY (30) DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE <br />TEMPORARY MEASURES ARE NO LONGER NEEDED. <br />2. HAZARDOUS MATERIALS MUST BE STORED AND DISPOSED OF PER M.P.C.A. REGULATIONS. <br />3. EXTERNAL WASHING OF CONSTRUCTION VEHICLES MUST BE LIMITED TO A DEFINED AREA OF <br />THE SITE. RUNOFF MUST BE CONTAINED AND WASTE PROPERLY DISPOSED OF. NO ENGINE <br />P18NEERengineering' <br />DECREASING IS ALLOWED ON SITE. <br />ava,EnclN6rxs ,•.ro>•TANNVts wro.nmverLRS (651) 681 -1914 <br />Ifi_ c4,iry mat w: Plan waty�Ba.w Try Nam ` <br />Rcvili -I <br />2422 Enterprise Drive Fax: 681 -9488 <br />owe„ y air sDycTVsiPn a w1I <br />w T. cnrrNc <br />Mendota Heights, MN 55120 eer m <br />www.pion eng.eo <br />m a dwy Lire M PTDf.'si l Eng.- <br />Dnde tews DffC E_DfMinn w. <br />RCg.ND. 19860 Datc 04- 242813 <br />©2013 Pi- Engine g, P.A. <br />O yJPF'PIP <br />jeJeG <br />FINISHED GRADE <br />GRADING GRADE <br />SOIL N <br />0 <br />-_ 0LMIN. <br />SLAB ON GRADE <br />NO SCALE <br />L.1 <br />J> <br />~W <br />If o w <br />�qk <br />10: 1 <br />3 <br />MIN. 2' COMPACTED q <br />CLAY LINER. <br />STORM WATER BASIN SECTION <br />TEMP ROCK CONSTRUCTION ENTRANCE <br />72' <br />1 <br />1 <br />NIL 0.5' TOPSOIL GRADING GRADE <br />VARIES <br />PROPOSED FINISHED GRADE <br />EXISTING GRADE <br />I - <br />Galvanized J bolt <br />w/ wing nut <br />CATCHBASIN INSERT <br />SELECT BACKFILL) \\ // LIMIT OF SUBGRADE EXCAVATION <br />MATERIAL SELECT BACKFILL <br />MATERIAL \Sj p,6t- P�RIP� <br />COMPACTED BACKFILL sX ON M/ <br />r <br />NON- SELECT BACKFILL MATERIAL <br />NON - SELECT MA <br />BACKFILL MATERIAL MAX' COMPACTED BACKFILL <br />COMPACTED BACKFILL MAX <br />MIN. ryD <br />BOTTOM OF UNSTAB E MATERIAL <br />SUBGRADE CORRECTION DETAIL <br />NO SCALE <br />21.604 DIA. <br />$ S O <br />_ .225 CK <br />Silt Fabric Sleeve <br />per MnDOT special <br />o provision 3886 <br />25. DIA. <br />25.681 DIA. <br />26.806 DIA. <br />TAH O.D. <br />27" INFRASAFE SEDIMENT CONTROL BARRIER -DG <br />(FOR USE WITH DITCH GRATE INLET CASTINGS) <br />STANDARD DETAIL <br />DETAILS I MEADOWACREEK BUILDERS <br />LANE NORTH <br />BENCH MARK <br />DOUBLE SPIKE EAST FACE OF POWER <br />POLE WEST OF FILLMORE STREET NW. <br />50 FT SOUTH OF 178TH AVE. NW. <br />ELEV- 897.82 <br />TRIPLE SPIKE EAST FACE OF POWER <br />POLE NW QUADRANT OF FILLMORE <br />STREET AND 175TH AVE. NW. <br />ELEV= 909.73 <br />00-ENG-1 13027- SEIEFF -DTL <br />KLIEVER LAKE FIELDS 4TH ADDITION 9 0 1 F 9 <br />EL.K RIVER, MINNESOTA <br />