My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1 SR 06-17-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
06-17-2013
>
7.1 SR 06-17-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2013 10:40:17 AM
Creation date
6/13/2013 1:36:02 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/17/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. All required subdivision shall be provided in an electronic format (.dwg file) as required by the <br />City Ordinance and Land Use Application prior to recording of the plat. <br />10. This approval of the Preliminary Plat shall expire after 1 year, unless the property owner or <br />owner's agent has submitted a Final Plat or letter of request for extension. <br />11. Satisfaction of the easement vacation issue as part of Kliever Lake Fields 3�d addition to the <br />satisfaction of Centerpoint Energy. <br />Issues #1,5,6, and 11 are reflected in the revised drawings, or in the response letters. <br />Planning Commission comment <br />Planning Commissioners commented on the landscaping, questioned the easement vacation, and <br />questioned the zone change to PUD. <br />Public Comment <br />One area resident spoke at the public hearing. He was concerned with the possibility of changing the <br />PUD in the future to allow apartment buildings. He questioned the guest parking areas, and the term of <br />construction. <br />The Planning Commission does not review final plats, or easement vacations. <br />Easement vacation. Kliever Lake Fields 3rd addition included a common lot, encumbered by a drainage <br />and utility easement. Due to changes in the project layout, this easement needs to be vacated. It will be <br />replaced by a new D/U easement. Originally, Centerpoint Energy had some concerns with the vacation, <br />but those concerns have been addressed. <br />Final Plat. The Final Plat must be consistent with the approved preliminary plat. Approval by <br />resolution allows recordable copies to be prepared and signed by the Mayor and Administrator. Because <br />there is no public infrastructure proposed, there is no development agreement. <br />FINANCIAL IMPACT <br />None <br />ATTACHMENTS <br />1. Location map <br />2. June 11, 2013 Planning Commission packet <br />3. Revised landscaping plan <br />4. Easement vacation exhibit <br />5. Easement vacation comment letter <br />6. Centerpoint response <br />7. Resolution for Easement vacation <br />8. Revised final plat <br />9. Resolution for final plat <br />10. ERMU response to water issue <br />11. Ordinance for zone change <br />
The URL can be used to link to this page
Your browser does not support the video tag.